My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />INTERGENERATIONAL RECREATION CENTER <br />appropriate, for the context of requirements. <br />before proceeding. <br />1.5 ACTION SUBMITTALS <br />JULY 25, 2014 <br />100% CONSTRUCTION DOCUMENTS <br />Refer uncertainties to Architect for a decision <br />A. Shop Drawings: For mockups, provide plans, sections, and elevations, indicating materials and <br />size of mockup construction. <br />1. Indicate manufacturer and model number of individual components. <br />2. Provide axonometric drawings for conditions difficult to illustrate in two dimensions. <br />1.6 INFORMATIONAL SUBMITTALS <br />A. Contractor's Quality -Control Plan: For quality -assurance and quality -control activities and <br />responsibilities. <br />B. Qualification Data: For Contractor's quality -control personnel. <br />C. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, <br />submit copy of written statement of responsibility sent to authorities having jurisdiction before <br />starting work on the following systems: <br />1. Seismic -force -resisting system, designated seismic system, or component listed in the <br />designated seismic system quality -assurance plan prepared by Architect. <br />2. Main wind -force -resisting system or a wind -resisting component listed in the wind -force - <br />resisting system quality -assurance plan prepared by Architect. <br />D. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to <br />demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br />recent report on the inspection of the testing agency by a recognized authority. <br />E. Schedule of Tests and Inspections: Prepare in tabular form and include the following: <br />1. Specification Section number and title. <br />2. Entity responsible for performing tests and inspections. <br />3. Description of test and inspection. <br />4. Identification of applicable standards. <br />5. Identification of test and inspection methods. <br />6. Number of tests and inspections required. <br />7. Time schedule or time span for tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality -control service. <br />1.7 CONTRACTOR'S QUALITY -CONTROL PLAN <br />A. Quality -Control Plan, General: Submit quality -control plan within 10 days of Notice to <br />Proceed, and not less than five days prior to preconstruction conference. Submit in format <br />acceptable to Architect. Identify personnel, procedures, controls, instructions, tests, records, <br />QUALITY REQUIREMENTS 01 40 00 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.