Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />and forms to be used to carry out Contractor's quality -assurance and quality -control <br />responsibilities. Coordinate with Contractor's construction schedule. <br />B. Quality -Control Personnel Qualifications: Engage qualified full-time personnel trained and <br />experienced in managing and executing quality -assurance and quality -control procedures <br />similar in nature and extent to those required for Project. <br />1. Project quality -control manager may also serve as Project superintendent. <br />Submittal Procedure: Describe procedures for ensuring compliance with requirements through <br />review and management of submittal process. Indicate qualifications of personnel responsible <br />for submittal review. <br />D. Testing and Inspection: In quality -control plan, include a comprehensive schedule of Work <br />requiring testing or inspection, including the following: <br />1. <br />2. <br />3. <br />Contractor -performed tests and inspections including subcontractor -performed tests and <br />inspections. Include required tests and inspections and Contractor -elected tests and <br />inspections. <br />Special inspections required by authorities having jurisdiction and indicated on the <br />"Statement of Special Inspections." <br />Owner -performed tests and inspections indicated in the Contract Documents. <br />E. Continuous Inspection of Workmanship: Describe process for continuous inspection during <br />construction to identify and correct deficiencies in workmanship in addition to testing and <br />inspection specified. Indicate types of corrective actions to be required to bring work into <br />compliance with standards of workmanship established by Contract requirements and approved <br />mockups. <br />F. Monitoring and Documentation: Maintain testing and inspection reports including log of <br />approved and rejected results. Include work Architect has indicated as nonconforming or <br />defective. Indicate corrective actions taken to bring nonconforming work into compliance with <br />requirements. Comply with requirements of authorities having jurisdiction. <br />1.8 REPORTS AND DOCUMENTS <br />A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br />Sections. Include the following: <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, and telephone number of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspecting. <br />QUALITY REQUIREMENTS 01 40 00 - 4 <br />