Laserfiche WebLink
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />A. Ready -Mixed Concrete: Measure, batch, mix, and deliver concrete according to <br />ASTM C 94/C 94M and ASTM C 1116/C 1116M, and furnish batch ticket information. <br />1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from <br />1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and <br />delivery time to 60 minutes. <br />PART 3 - EXECUTION <br />3.1 FORMWORK <br />A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, <br />lateral, static, and dynamic loads, and construction loads that might be applied, until structure <br />can support such loads. <br />B. Construct formwork so concrete members and structures are of size, shape, alignment, <br />elevation, and position indicated, within tolerance limits of ACI 117. <br />C. Limit concrete surface irregularities, designated by ACI 347 as abrupt or gradual, as follows: <br />Class A, 1/8 inch for smooth -formed finished surfaces. <br />Class B, 1/4 inch for rough -formed finished surfaces. <br />D. Construct forms tight enough to prevent loss of concrete mortar. <br />Fabricate forms for easy removal without hammering or prying against concrete surfaces. <br />Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide <br />top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical. <br />1. Install keyways, reglets, recesses, and the like, for easy removal. <br />2. Do not use rust -stained steel form -facing material. <br />F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required <br />elevations and slopes in finished concrete surfaces. Provide and secure units to support screed <br />strips; use strike -off templates or compacting -type screeds. <br />G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork <br />is inaccessible. Close openings with panels tightly fitted to forms and securely braced to <br />prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous <br />locations. <br />H. Chamfer exterior corners and edges of permanently exposed concrete. <br />Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads <br />required in the Work. Determine sizes and locations from trades providing such items. <br />J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, <br />and other debris just before placing concrete. <br />K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and <br />maintain proper alignment. <br />CAST -IN-PLACE CONCRETE 033000 - 11 <br />