My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:19 PM
Creation date
10/5/2015 1:22:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (2 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Center
Contract and Specifications
Area
South County Regional Pari
Supplemental fields
SmeadsoftID
14251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />strength and no compressive -strength test value falls below specified compressive <br />strength by more than 500 psi. <br />11. Test results shall be reported in writing to Architect, concrete manufacturer, and <br />Contractor within 48 hours of testing. Reports of compressive -strength tests shall contain <br />Project identification name and number, date of concrete placement, name of concrete <br />testing and inspecting agency, location of concrete batch in Work, design compressive <br />strength at 28 days, concrete mixture proportions and materials, compressive breaking <br />strength, and type of break for both 7- and 28 -day tests. <br />12. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may <br />be permitted by Architect but will not be used as sole basis for approval or rejection of <br />concrete. <br />13. Additional Tests: Testing and inspecting agency shall make additional tests of concrete <br />when test results indicate that slump, air entrainment, compressive strengths, or other <br />requirements have not been met, as directed by Architect. Testing and inspecting <br />agency may conduct tests to determine adequacy of concrete by cored cylinders <br />complying with ASTM C 42/C 42M or by other methods as directed by Architect. <br />14. Additional testing and inspecting, at Contractor's expense, will be performed to determine <br />compliance of replaced or additional work with specified requirements. <br />15. Correct deficiencies in the Work that test reports and inspections indicate do not comply <br />with the Contract Documents. <br />D. Measure floor and slab flatness and levelness according to ASTM E 1155 within 24 hours of <br />finishing. <br />END OF SECTION 033000 <br />CAST -IN-PLACE CONCRETE 033000 - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.