My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />B. Protect wood from exposure to moisture. Do not deliver wood components until after concrete, <br />masonry, plaster, ceramic tile, and similar wet work is complete and dry. <br />C. Store wood components in a dry, warm, well -ventilated, weathertight location and in a <br />horizontal position. <br />1.8 FIELD CONDITIONS <br />A. Conditioning period begins not less than seven days before wood athletic flooring installation, is <br />continuous through installation, and continues not less than seven days after installation. <br />1. Environmental Conditioning: Maintain an ambient temperature between 65 and 75 deg F <br />(18 and 24 deg C) and relative humidity planned for building occupants, but not less than <br />35 percent or more than 50 percent, in spaces to receive wood athletic flooring during the <br />conditioning period. <br />2. Wood Conditioning: Move wood components into spaces where they will be installed, no <br />later than beginning of the conditioning period. <br />a. Do not install wood athletic flooring until wood components adjust to relative <br />humidity of, and are at same temperature as, spaces where they are to be installed. <br />b. Open sealed packages to allow wood components to acclimatize immediately on <br />moving wood components into spaces in which they will be installed. <br />B. After conditioning period, maintain relative humidity and ambient temperature planned for <br />building occupants. <br />C. Install wood athletic flooring after other finishing operations, including painting, have been <br />completed. <br />1.9 COORDINATION <br />A. Coordinate layout and installation of wood athletic flooring systems with floor inserts for <br />gymnasium equipment. <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A. Manufacturers: Subject to compliance with requirements, available manufacturers offering <br />products that may be incorporated into the Work include, but are not limited to, the <br />following: <br />1. <br />2. <br />3. <br />4. <br />5. Mondo. <br />6. Robbins S <br />Sport Court International. <br />WOOD ATHLETIC FLOORING 096466 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.