My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />3.2 INSTALLATION <br />A. General: Comply with manufacturer's written installation instructions. Install units rigid, <br />straight, level, and plumb. Secure units in position with manufacturer's recommended anchoring <br />devices. Installer shall have five years experience. <br />1. Maximum Clearances: <br />a. Pilasters and Panels: 1/2 inch (13 mm). <br />b. Panels and Walls: 1 inch (25 mm). <br />2. Full -Height (Continuous) Brackets: Secure panels to walls and to pilasters with full - <br />height brackets. <br />a. Locate bracket fasteners so holes for wall anchors occur in masonry or tile joints if <br />possible. <br />b. Align brackets at pilasters with brackets at walls. <br />B. Floor -and -Ceiling -Anchored Units: Secure pilasters to supporting construction and level, <br />plumb, and tighten. Hang doors and adjust so doors are level and aligned with panels when <br />doors are in closed position. <br />C. Urinal Screens: Attach with anchoring devices to suit supporting structure. Set units level and <br />plumb, rigid, and secured to resist lateral impact. <br />3.3 ADJUSTING <br />A. Hardware Adjustment: Adjust and lubricate hardware according to hardware manufacturer's <br />written instructions for proper operation. Set hinges on in -swinging doors to hold doors open <br />approximately 30 degrees from closed position when unlatched. Set hinges on out -swinging <br />doors return doors to fully closed position. <br />END OF SECTION 10 21 13 <br />PLASTIC TOILET COMPARTMENTS 10 21 13 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.