My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />2.8 ALKYD PAINTS <br />A. Interior Alkyd (Flat): MPI #49 (Gloss Level 1). <br />B. Interior Alkyd (Eggshell): MPI #51 (Gloss Level 3). <br />C. Interior Alkyd (Semigloss): MPI #47 (Gloss Level 5). <br />D. Interior Alkyd (Gloss): MPI #48 (Gloss Level 6). <br />2.9 QUICK -DRYING ENAMELS <br />A. Quick -Drying Enamel (Semigloss): MPI #81 (Gloss Level 5). <br />B. Quick -Drying Enamel (High Gloss): MPI #96 (Gloss Level 7). <br />2.10 DRY FOG/FALL COATINGS <br />A. Latex Dry Fog/Fall: MPI #118. <br />B. Waterbome Dry Fall: MPI #133. <br />C. Interior Alkyd Dry Fog/Fall: MPI #55. <br />2.11 FLOOR COATINGS <br />A. Interior Concrete Floor Stain: MPI #58. <br />B. Interior/Exterior Clear Concrete Floor Sealer (Water Based): MPI #99. <br />C. Interior/Exterior Clear Concrete Floor Sealer (Solvent Based): MPI #104. <br />2.12 SOURCE QUALITY CONTROL <br />A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure: <br />1. Owner will engage the services of a qualified testing agency to sample paint materials. <br />Contractor will be notified in advance and may be present when samples are taken. If <br />paint materials have already been delivered to Project site, samples may be taken at <br />Project site. Samples will be identified, sealed, and certified by testing agency. <br />2. Testing agency will perform tests for compliance with product requirements. <br />3. Owner may direct Contractor to stop applying coatings if test results show materials <br />being used do not comply with product requirements. Contractor shall remove <br />noncomplying paint materials from Project site, pay for testing, and repaint surfaces <br />painted with rejected materials. Contractor will be required to remove rejected materials <br />from previously painted surfaces if, on repainting with complying materials, the two <br />paints are incompatible. <br />INTERIOR PAINTING 09 91 23 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.