My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:10:05 PM
Creation date
10/5/2015 1:22:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200C
Agenda Item Number
12.F.1 (1 of 2 docs)
Entity Name
Kast Construction Company, LLC
Subject
Contract and Document Specifications
Intergenerational Recreation Facility
Area
South County Regional Park
Supplemental fields
SmeadsoftID
14252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY JULY 25, 2014 <br />INTERGENERATIONAL RECREATION CENTER 100% CONSTRUCTION DOCUMENTS <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and conditions, with Applicator present, for compliance with requirements <br />for maximum moisture content and other conditions affecting performance of the Work. <br />Maximum Moisture Content of Substrates: When measured with an electronic moisture meter <br />as follows: <br />1. Concrete: 12 percent. <br />2. Masonry (Clay and CMU): 12 percent. <br />3. Wood: 15 percent. <br />4. Gypsum Board: 12 percent. <br />5. Plaster: 12 percent. <br />C. Gypsum Board Substrates: Verify that fmishing compound is sanded smooth. <br />D. Plaster Substrates: Verify that plaster is fully cured. <br />E. Spray -Textured Ceiling Substrates: Verify that surfaces are dry. <br />F. Verify suitability of substrates, including surface conditions and compatibility with existing <br />finishes and primers. <br />G. Proceed with coating application only after unsatisfactory conditions have been corrected. <br />1. Application of coating indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" <br />applicable to substrates indicated. <br />B. Remove hardware, covers, plates, and similar items already in place that are removable and are <br />not to be painted. If removal is impractical or impossible because of size or weight of item, <br />provide surface -applied protection before surface preparation and painting. <br />1. After completing painting operations, use workers skilled in the trades involved to <br />reinstall items that were removed. Remove surface -applied protection if any. <br />C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, <br />and incompatible paints and encapsulants. <br />1. Remove incompatible primers and reprime substrate with compatible primers or apply tie <br />coat as required to produce paint systems indicated. <br />D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do <br />not paint surfaces if moisture content or allcalinity of surfaces to be painted exceeds that <br />permitted in manufacturer's written instructions. <br />INTERIOR PAINTING 09 91 23 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.