Laserfiche WebLink
ANSWER NO. 14 <br />Fan subcontractor to supply the fans. General Contractor to determine based upon fan supplier who supplies the <br />mounts and installation, as it varies by manufacturer. <br />QUESTION NO. 15 <br />Sheet E1.00.01 - shows 2 type SLH fixtures at front driveway entry No such fixture on fixture schedule. Please give <br />fixture type. <br />ANSWER NO. 15 <br />The following information has been added to Light Fixture Schedule for Type SLH: DESCRIPTION: 4' LINEAR LED <br />SIGN LIGHT, SURFACE BOX, WHITE LED, FLOOD DISTRIBUTION, ADJUSTABLE SURFACE MOUNT BRACKET, 6" <br />EXTENDED ARM, HALF EXTERIOR VISOR, 0-10V DIMMING, BLACK ANODIZED FINISH, IP66 RATED"; CAT. #: HYDREL <br />#RHY4-SSBR-WHT41K-MVOLT-FL-ASM-EARM6"-HVSR-CLS20-LDIM-BLA; 277V; 52W LED LAMPS, 4100K; REMARKS: <br />FIXTURES ARE TO BE AIMED & DIMMED AS NECESSARY BY CONTRACTOR IN THE FIELD, AT NIGHT, AT THE <br />DIRECTION OF ENGINEER/ARCHITECT. <br />In addition, additional switching/dimming power pack has been added to Lighting Control Block Diagram, for this <br />lighting control zone ZE16, and a 3' setback has been indicated on the site plan. <br />QUESTION NO. 16 <br />I know in Addendum #2 is was stated that the site bid forms are missing a few items. We noticed the storm and <br />utilities are not matching as wells. Also, per plan there is an onsite pavement section of 6" rock and 8" <br />stabilization, I don't see that on the forms either. Per the bid forms it appears you want the 8" rock and 12" <br />stabilization for the entire project. Just wanted to make sure a revised bid form was being issued. <br />ANSWER NO. 16 <br />Bid items have been modified and 6" Cemented Coquina Shell Base and 8" Stabilized Subgrade (LBR 40) have been <br />added to the attached Itemized Bid Schedule. <br />QUESTION NO. 17 <br />We would like the opportunity to bid Florock Resinous Flooring as an equal to the products specified for the <br />Intergenerational Recreation Facility. <br />SECTION 09 72 50 -DECORATIVE QUARTZ EPDXY FLOORING <br />SECTION 09 67 23 - RESINOUS FLOORING <br />Please advise where and to whom I can send a submittal packet for approval. <br />ANSWER NO. 17 <br />Please see Clarification statement above. <br />Page 5 of 7 <br />'Public Works\ENGINEERING DIVISION PROJECTS \1135-S County Park Intergeneratiional Rec Facility \Admim\ADDENDUMS\Addendum No. 3 I I-5-2014.doc <br />