Laserfiche WebLink
QUESTION NO. 9 <br />Sheet E1.00.01 type SLC pole base shows note on sheet E1.00.03 No such sheet exists. Please provide pole base <br />details. <br />ANSWER NO. 9 <br />This detail is on Sheet E1.03. <br />QUESTION NO. 10 <br />Sheet E1.00.01 -will Communications underground conduits be encased in concrete? <br />ANSWER NO. 10 <br />Yes; this will be similar to Detail 8 on Sheet E1.05.01 <br />QUESTION NO. 11 <br />Sheet E1.00.01 Site Lighting controls. Please clarify. Plan shows Circuits 14 and 15 for pole lights. Also shows zones <br />ZE6 and ZE7 controlling pole lights. Circuit 14 is on both Zone controls as well as circuit 15. Will relays be installed <br />in individual pole lights? <br />ANSWER NO. 11 <br />Circuiting has been revised so that Circuit 14 is only for Zone ZE7, and Circuit 15 is only for Zone ZE6; power packs <br />for exterior lighting will be in nlight cabinets in the electrical rooms adjacent to their associated lighting panels - a <br />note has been added to Lighting Control Block Diagram notes on E.07.01 indicating this. <br />QUESTION NO. 12 <br />Sheet E1.00.01 - shows Note on page stating: (2) 4" with (3) 1" inner duct to property line. Is this the conduit <br />shown with a pull box going from property line to Multi- Purpose building? <br />ANSWER NO. 12 <br />Yes; this has been corrected to show leader lines to the pull box and to the communications ductbank. <br />QUESTION NO. 13 <br />Sheet E1.00.01 - shows a Fountain equipment vault. Please give details, dimensions for vault. <br />ANSWER NO. 13 <br />Fountain equipment/vault is by fountain vendor/installer, not Division 26. It is presumed that the disconnecting <br />means will located within this vault. It is a placeholder, and fountain has not been designed as of yet. <br />QUESTION NO. 14 <br />Sheet E1.03.03 Note 4 Fans: Who supplies and mounts fans? Please provide product types and sizes. <br />Page 4 of 7 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\I135-S County Park Intergeneratiional Rec Facility \Admim\ADDENDUMS\Addendum No. 3 1 I-5-2014.doc <br />