Laserfiche WebLink
ADDENDUM NO. 3 11/5/2014 <br />for Erosion and Sedimentation Control" and Chapter 5 — "Best Management Practices <br />for Dewatering" of the Florida Erosion and Sediment Control Inspector's Manual. In the <br />event of a conflict between the referenced Chapters and these Specifications, the more <br />stringent requirement shall prevail. <br />1.2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br />A. The OWNER has obtained certain permits for this project and they are listed in <br />paragraph SC -6.08 of the Supplementary Conditions. Per paragraph SC -6.08.0 of <br />the Supplementary Conditions, the CONTRACTOR shall apply for, obtain, and pay <br />for all other required permits, licenses, sampling, and tests. Permits the <br />CONTRACTOR may need to secure may include but not be limited to: <br />1. Long-term and/or short-term dewatering permit as required by the St. Johns <br />River Water Management District (SJRWMD). Generally, only the short-term <br />permit is required. Contact SJRWMD at (321) 984-4940 to determine which <br />permit is required and the associated statutory requirements; <br />2. SJRWMD RDS -50 Permit (required); <br />3. The State of Florida Generic Permit for Stormwater Discharge From Large <br />and Small Construction Activities (required). Contact the Florida <br />Department of Environmental Protection (FDEP) at (866) 336-6312 (toll <br />free) or (850) 245-7522 or www.dep.state.fl.us/water/stormwater/npdes/ <br />4. FDEP's Uncontaminated Groundwater Release Permit (required if <br />dewatering occurs). This permit requires water quality testing by a State <br />certified laboratory. <br />B. Provide copies of all permits to the OWNER and ENGINEER and comply with all <br />conditions contained in all permits at no extra cost to the OWNER. If there is a conflict <br />between any permit requirement and these Specifications, the more stringent <br />specification or requirement shall govern. <br />C. In addition to paying for all permit fees, CONTRACTOR shall also pay for all water <br />quality sampling and laboratory tests required by any permit. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans and permits and <br />approved for use by the OWNER and applicable permitting authorities. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing laboratory <br />selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br />determines that the pollution control and treatment system is not in compliance with <br />the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution <br />control and treatment system is properly constructed or repaired, and complies with <br />the approved pollution control and treatment system plans and specifications. <br />C. Schedule construction to minimize erosion and stormwater runoff from the <br />01025-4 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1135-5 County Park Intergeneratiional Rec <br />Facility \AdmimIADDENDUMS\Technical Specs (SITE) - Addendum No. 311-5-2014.doc <br />Technical Specifications <br />