My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 3 11/5/2014 <br />construction site. Implement erosion control measures on disturbed areas as soon <br />as practicable in portions of the site where construction activities have temporarily or <br />permanently ceased, but in no case more than 7 days after the construction activity <br />in that portion of the site has temporarily or permanently ceased. In addition to <br />other temporary erosion control measures that may be implemented, application of <br />polyacrylamide is required on all such disturbed areas within 7 days after the <br />construction activity in that portion of the site has temporarily or permanently <br />ceased, unless final landscaping has been installed. Polyacrylamide application <br />shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water <br />quality violation occurs, immediately cease all work contributing to the water quality <br />violation and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to <br />the Work completed or in progress. The receiving point forwaterfrom construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation <br />and Maintenance: Installation and maintenance of all erosion and stormwater <br />pollution control devices, shall be by a State Certified erosion control subcontractor <br />who specializes in the installation and maintenance of such devices. After <br />installation, this specialty subcontractor shall maintain the erosion and stormwater <br />pollution control devices until in the ENGINEER's sole opinion, the devices are no <br />longer necessary (such time not to extend past the date the OWNER formally <br />accepts the project as complete). Before beginning construction, submit to Indian <br />River County for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County. <br />Submit the approved SWPPP to the ENGINEER before beginning construction. <br />Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and <br />Treatment of. Dewatering Water and Stormwater From the Construction Site" <br />(located at the end of this Section). <br />01025-5 <br />F:1Public Works\ENGINEERING DIVISION PROJECTS11135-S County Park Intergeneratiional Rec <br />Facility\Admim\ADDENDUMS1Technical Specs (SITE) - Addendum No. 311-5-2014.doc <br />Technical Specifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.