Laserfiche WebLink
ADDENDUM NO. 3 11/5/2014 <br />SECTION 00007 - FIELD OFFICE <br />The Specifications for Field Office (Contractor) shall include furnishing and installing a <br />Construction Field Office within the Project Limits in accordance with these Specifications. <br />It is the Contractor's responsibility to clean the inside of the building and provide furnishings. <br />The building shall be a minimum of 900 square feet with air conditioning, heat, restroom and <br />sufficient space to hold progress meetings. Each room shall have at least one (1) <br />weatherproof window and two electrical and data outlets. Each window shall be a minimum of <br />8 square feet, be screened and open and close to provide adequate ventilation. Equip each <br />outside door with a lock. The Building shall be equipped with tables and chairs to <br />accommodate meetings for a minimum of 12 people. The field office must provide 2 desks, <br />chairs, cabinets, etc. for 2 county field representatives. Also, contractor shall provide, one (1) <br />rough plan rack, one (1) supply cabinet, a minimum of five (5) gallons of potable water <br />maintained by the Contractor, one (1) printer/scanner machine, and one (1) fire-resistant (2) <br />drawer legal size file cabinet meeting fire underwriters' approval for no less than a 1 -hour test. <br />The field office must include the following TWO computers for COUNTY PERSONNEL: <br />• .Dell OptiPlex 9020 Minitower Base, CORE i7 4770 Processor (3.4GHz, 8M) with <br />16GB, 1600MHz DDR3 memory with 2 Dell 24 -inch Flat Panel Display, U2412M, <br />Windows 7 Professional (64Bit), minimum 1 TB hard • drive, 1 GB video card, Office <br />2013 Professional edition, Adobe Acrobat XI standard edition <br />The computers mentioned above must be purchased from a known retailer/wholesaler brand <br />new with all warranty information included. Contractor shall warranty the computers for the <br />length of the project. Once the project is complete the above mentioned computers and <br />printer/scanner will be the property of the COUNTY. <br />The Contractor will be required to provide electric, (2) landline phones, High Speed Internet <br />service or equivalent satellite or mobile service if DSL is not available to the field office. <br />Internet link DHCP must be user configurable to accommodate County network <br />configurations. <br />The field office shall be ready for use no later than ten (10) calendar days after the date the <br />Contract is fully executed and before any other work is started, and shall be maintained by the <br />Contractor until one (1) month after final acceptance of the Project by the Owner. <br />Field Office shall have restroom within the building with approved sanitary and water <br />connections. <br />Item of Payment <br />Payment shall be made under: <br />Bid Item No. 5 - Field Office — Each Day <br />01025-20 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1135-S County Park Intergeneratiional Rec <br />Facility\Admim\ADDENDUMS\Technical Specs (SITE) - Addendum No. 3 11-5-2014.doc <br />Technical Specifications <br />