My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 3 11/5/2014 <br />3. Bell and Spigot Connections: <br />Joints in bell and spigot pipe shall be push -on, mechanical, or restrained <br />joints in accordance with AWWA Standard C-111 (ANSI 21.11-85), or <br />latest revision. Mechanical joint pipe set -screw type retainer glands will <br />not be permitted. <br />4. Flanged Connections: <br />Flanged pipe with screwed -on flanges shall be furnished with long hubs, <br />and the flanges shall be screwed on the threaded end of the pipe in the <br />shop, and the face of the flange and end of pipe refaced together. There <br />shall be no leakage through the pipe threads and the flanges shall be <br />designed to prevent corrosion of the threads from outside. The back of <br />the hub shall be caulked where the hub threads joint with the pipe. <br />5. Valve Box Adjustments: <br />Cost of valve nut extenders shall be included in cost of valve box <br />adjustments where needed. <br />E. Disinfecting Potable Water Pipelines <br />Before being placed in service, all potable water pipelines shall be chlorinated in accordance <br />with the latest edition of AWWA C-651, "Standard Procedure for Disinfecting Water Mains", <br />except that the use of tablets is strictly prohibited. The procedure shall be approved by the <br />Engineer. The location of the chlorination and sampling points will be as specified by the <br />Florida Department of Environmental Protection, Water Distribution System Permit. Taps for <br />chlorination and sampling shall be uncovered and backfilled by the Contractor, as required. <br />ITEM OF PAYMENT <br />Payment for the work specified in this item shall be made under: <br />Bid Item No <br />Bid Item No <br />Bid Item No. <br />Bid Item No. <br />Bid Item No. <br />indicated) - <br />Bid Item No. <br />Bid Item No. <br />Watermain <br />. 83 - Sanitary Sewer Manhole (4' - 6' Depth) - Per Each <br />. 84 - Sanitary Sewer Manhole (6' - 8' Depth) - Per Each <br />85 - 8" PVC Sanitary Sewer - Per Linear Foot <br />86 - 3" Potable Service - Per Each <br />87 - 8" Potable Water Main with Valves and Appurtences (as <br />Per Linear Foot <br />88 - Siamese Fire Truck Connection - Per Each <br />89 - Relocate Existing Fire Hydrant (Includes 40 LF - 6" PVC <br />- Per Each <br />Bid Item No. 90 - Furnish and Install Fire Hydrant Assembly (Complete with 6" <br />Gate Valve and Pipe) - Per Assembly <br />01025-32 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11135-5 County Park Intergeneratiional Rec <br />Facilitv\Admim1ADDENDUMS\Technical Specs (SITE) -Addendum No. 311-5-2014 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.