My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS: <br />In the Project Pre -Bid Minute Meetings (Addendum No. 1), a Question was asked "Provide requirements <br />for scoreboard." Answer "(2) scoreboards will be included in the bid. The specifications for the <br />scoreboards will be issued in a pending addendum." The specifications for the 2 scoreboards are <br />attached hereto in Section 116625 Gymnasium Scoreboard. <br />In Addendum No. 2, Question No. 2 read "There does not appear to be a specification for the 3 flag poles. <br />Will one be made available? Answer No. 2 stated "No flag poles are to be included on the project. Their <br />removal will be noted and incorporated within the pending drawing addendum." Please see RC -L1 -01- <br />02 -LANDSCAPE PLAN.pdf <br />QUESTIONS AND ANSWERS: <br />QUESTION NO. 1 <br />Please provide Fixture specifications for Type X fixture (Exit Lights). None shown on sheet E1.00.00. <br />ANSWER NO. 1 <br />Gymnasium area: Provide LED thin profile, brushed aluminum, green letters, self-contained battery with self- <br />test/self-diagnostics, wire guard; EXITRONIX #G402/403 -WB -BA -G2 -WG**; in the remaining areas, provide LED <br />edge -lit exit light, recessed, with battery, green letters/mirror panel, white finish, self-test/self-diagnostics, <br />EXITRONIX 902/903-R-WB-GM-**-WH-G2; 277V for both types; contractor is to provide counts for double face, <br />single face, wall/ceiling/universal mount, directional arrows, appropriate wire guard selection, per the lighting <br />plans. <br />QUESTION NO. 2 <br />Is there a contractor doing the fountain? Is the scope for electrical contractor to provide power to vault only? <br />Who is providing Fountain lights? <br />ANSWER NO. 2 <br />Similar question was asked in IRC Bidding Questions Addendum #3, Question No. 13 in reference to the <br />fountain vault. Please refer to responses that addendum. In addition, the scope of Division 26 is to <br />provide disconnecting means and single point power connection to fountain equipment control panel <br />only. Fountain lights, fountain pump, control wiring, control panel would be by the fountain equipment <br />vendor/installer. <br />QUESTION NO. 3 <br />Please provide cut sheets for types P1 and P1E not on fixture schedule. Also, I found no counts for types and J1 <br />Fixtures. Have those fixtures been eliminated? <br />Page 2 of 20 <br />F:\Public Works\ENGINEERING DIVISION PROIECTS11135-S County Park Inlergeneratiional Rec Facility \Admim\ADDENDUMS\Addendum No. 4 I I-12-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.