My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANSWER NO. 3 <br />P1 and P1E are types P and PE respectively. There don't appear to be any J1's, just J1E. <br />QUESTION NO. 4 <br />Who is responsible for the water use permit application and its fees? <br />ANSWER NO. 4 <br />Contractor is responsible for permit application and fees. <br />QUESTION NO. 5 <br />What is the fitting or socket type to be used for the mainline ? <br />ANSWER NO. 5 <br />Solvent weld fittings are acceptable. <br />QUESTION NO. 6 <br />What is the voltage will be provided for the pumpstation? States 3 phase power only. <br />ANSWER NO. 6 <br />Power source can be reduced to meet pump requirements. Contractor shall state requirements prior to work so <br />appropriate power can be provided to pump location. <br />QUESTION NO. 7 <br />Please confirm pump as 7.5 hp. The well symbol indicates a 5hp in the equipment list and differs from the well <br />specifications. <br />ANSWER NO. 7 <br />The pump shall be 7.5 hp. <br />QUESTION NO. 8 <br />What is the TDH ( PSI ) @ 80 gpm is to be specified on the pump? <br />Page 3 of 20 <br />F:1Public WorkaIENGINEERING DIVISION PROJECTSII 135-S County Park Iniergeneratiional Rec Facility\AdmimUDDENDUMSWddendum No. 4 I I-12-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.