Laserfiche WebLink
ANSWER NO. 8 <br />TDH is to be 55 psi. <br />QUESTION NO. 9 <br />Is the pump to be pressure demand or pumpstart ? <br />ANSWER NO. 9 <br />The pump shall be a pumpstart system. <br />QUESTION NO. 10 <br />Is a pressure control valve required? <br />ANSWER NO. 10 <br />A pressure control valve shall be required. <br />QUESTION NO. 11 <br />Is Variable Frequency Drive an option for the pumpstation ? <br />ANSWER NO. 11 <br />A Variable Frequency Drive is the preferred option for the pumpstation.. <br />QUESTION NO. 12 <br />Where are the limits of work boundaries to end at for phase 2 (NIC) ? As noted between valves 6 thru 11 and the <br />basketball courts on the plan. <br />ANSWER NO. 12 <br />Irrigation located within phase 2 area shall be installed as part of phase 1 to maintain grass in that area until phase <br />2 is constructed. <br />QUESTION NO. 13 <br />Is every sleeve on the plan to have a spare sleeve equal to the diameter called out on plan? <br />• Page 4 of 20 <br />F:\Public Works1ENGINEERING DIVISION PROJECTS\1115-S County Park Intergeneratiional Rec Facility \Admim1ADDENDI MS\Addendum No. 4 11-12-2014,doc <br />