Laserfiche WebLink
the contractor. The 'design intent' is what is shown in the details, the 'means and methods' is left to the <br />contractor. <br />QUESTION NO. 18 <br />Please clarify: Section 8800: This section is specified as 1". Curtain wall standard is 1 5/16" insulated, laminated <br />product. <br />ANSWER NO. 18 <br />Previously answered in Bid Addendum #2 question No. 8A; <br />Utilize the manufacturer standard 15/16" insulated, laminated product. <br />QUESTION NO. 19 <br />Please clarify that the interior aluminum storefront is Bronze anodized and the exterior is clear anodized. <br />ANSWER NO. 19 <br />Previously answered in Bid Addendum #2 question No. 8B; <br />The design intent was to highlight the separation between interior and exterior environments at their <br />thresholds. As such, interior storefronts are to be Bronze anodized and the exterior is to be Clear <br />anodized. <br />QUESTION NO. 20 <br />Where are we to insert the costs for the 6" DDCV assembly? <br />ANSWER NO. 20 <br />6" Double Detector Check Valve Assembly is added to the attached revised Itemized Bid Schedule. Also added to <br />attached Technical Specifications (SITE). <br />QUESTION NO. 21 <br />Please provide a detail for the 3" meter and RPZ assembly. Plans only provided a detail for a RPZ assembly. Where <br />are these cost to be inserted? <br />ANSWER NO. 21 <br />Indian River County Department of Utility Services standard detail "W-12" is attached. There is a Bid Line Item for <br />3" Potable Service. The 3" meter and RPZ Assembly should be included in that bid item. <br />Page 6 of 20 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\I13S-S County Perk Inlergeneraliional Rec Facility \ Adtrim ADDENDUMS1Addendum No. 4 11-12-2014 doc <br />