My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO. 22 <br />In response to Addendum No. 3, Question #5 (There is a bid item for 4" HDPE (N-12) 180 LF, the plans do not show <br />where this is to be installed. Please clarify as to where this is to be installed.) and Answer #5 (Bid item for 4" HDPE <br />(N-12) 180 LF has been changed to 380 LF. This will be for tying into the existing underdrains between the Lacrosse <br />fields. Also, two (2) additional Type C Inlets have been added, 260 LF of 15" CAP, 260 LF of 18" CAP, and 75 IF of <br />24" CAP to the existing swale on the west end of the Lacrosse field and drain to proposed Wet Detention Pond. <br />There are no existing construction plans for this additional work.), please clarify the following: <br />1. Please provide Rim and Invert Elevations for the additional Type C inlets. <br />2. Answer stated two (2) additional C inlets were added but the bid schedule was only increased by one (1). <br />3. Please provide a detail for the new 4" Underdrain and existing as to what is required for connections and <br />installation (rock, filter fabric, etc.). Is the 4" PE to be perforated? <br />ANSWER NO. 22 <br />1. Rim & Invert elevations for the inlets along the south side of the existing Athletic Fields (DS -24, DS -25 & DS - <br />26) are called out in the Storm Structure Table on Sheet C06. <br />2. Quantity has been corrected to show 13 Type C Inlets. Please see attached revised Itemized Bid Schedule. <br />3. 4" Underdrain shall be connected to solid 4" HDPE pipe and taken to inlets. There is no detail provided. <br />QUESTION NO. 23 <br />Plan quantities do not match revised bid schedule (Addendum #3) quantities - 8" HDPE, Plan show= 40', bid <br />schedule=16'. Clarify. <br />ANSWER NO. 23 <br />8" HDPE quantity has been increased to 50 LF. Please see attached revised Itemized Bid Schedule. <br />QUESTION NO. 24 <br />Plan quantities do not match revised bid schedule (Addendum #3) quantities - 18" HDPE, Plan show=262', bid <br />schedule=162'. Clarify. <br />ANSWER NO. 24 <br />18" HDPE quantity has been increased to 262 LF. Please see attached revised Itemized Bid Schedule. <br />QUESTION NO. 25 <br />Plan quantities do not match revised bid schedule (Addendum #3) quantities - P-7 Manholes, Plan show=6 ea.,bid <br />schedule=7 ea. Clarify <br />ANSWER NO. 25 <br />Bid Line Item for P-7 Manholes remains at 7 each. <br />Page 7 of 20 <br />F:Public Works\ENGINEERING DIVISION PROJECTS1I I35 -S County Park Intergeneratiional Rec FacilityVtdmimWDDENDUMS\Addendum No. 4 I 1-12.2014.doc <br />