QUESTION NO. 26 <br />Plan quantities do not match revised bid schedule (Addendum #3) quantities - Plans call for Cleanouts on the HDPE <br />drainage, where do we invert these costs? Clarify. <br />ANSWER NO. 26 <br />Roof drains and cleanouts are included in the Bid Price for "Construction Intergenerational Building Including Slab, <br />Building, Doors, Windows and all Items as Indicated on the Plan Specifications and in the Contract Documents <br />(Complete and Ready for Use)." <br />QUESTION NO. 27 <br />Storefront System — <br />It appears from details that the intent is curtain wall, with a 3 coat painted face cap <br />on exterior of building, and clear anodized for all interior? <br />ANSWER NO. 27 <br />Interior curtain wall system is to be Bronze Anodized. <br />Exterior curtain wall system is to be Clear Anodized. <br />QUESTION NO. 28 <br />Please confirm that MC cable is allowed for in wall use. <br />ANSWER NO. 28 <br />Refer to Specification Section 260519, Paragraphs 3.2.E & G. MC cable is only to be used for branch receptacle and <br />lighting circuits (i.e., not for mechanical equipment connections, etc.). <br />QUESTION NO. 29 <br />E1.00.02 One line diagram shows Company Switch CS -2. No location on corresponding sheet E1.03.01 shows <br />where this panel is located. Please give location. <br />ANSWER NO. 29 <br />Company Switch is shown on site plan E1.00.01 on outside of dumpster enclosure. <br />QUESTION NO. 30 <br />Are there any specifications for the voice, data and CATV cabling? <br />Page 8 of 20 <br />F:\Public Worka\ENGINEERING DIVISION PROJECTS \I 135-S County Park Intergeneratiional Rec Facility\Admim\ADDENDUMS'Addendum No. 4 I 1-12-20I4.doc <br />