My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANSWER NO. 63 <br />This specification is applicable to the design intent. Included are (12) differing manufactures capable of fabricating <br />systems that meet or exceed the design intent for this project. The General Contractor is free to choose between <br />them and is expected to do so, to meet the intent and to provide competitive bids. <br />QUESTION NO. 64 <br />Specification 102113 (Plastic Toilet Compartments), line 2.2E, calls for Solid HDPE panels, while the finish schedule on <br />A1.02.20, TP -1, calls for composite phenolic panels. Please advise which material to include. <br />ANSWER NO. 64 <br />Phenolic Panels. <br />QUESTION NO. 65 <br />Specification 08 3513 (Folding Doors) indicates finish (2.1-D Panel Facing) to be selected from manufacturers full <br />range. Can you be more specific to finish, such as fabric, wood, metal, glass, etc. <br />ANSWER NO. 65 <br />Utilize Nanawall as basis of design; powder coat aluminum, with opaque glass. <br />QUESTION NO. 66 <br />Addendum #1 indicated scoreboard specification was indicated to be issued in pending addendum, please advise <br />an allowance to carry if specification is not issued prior to bid date. <br />ANSWER NO. 66 <br />See attached specification 116625 Gymnasium Scoreboard. <br />QUESTION NO. 67 <br />Item #82 (Fountain Assembly) on Itemized Bid Schedule only indicates the light manufacturer (Hydrel) and quantity <br />of lights (there is no Type 6, note may be a typo to match sheet E1.00.01 which indicates typical of 6) but no <br />information for the fountains. Please provide additional information on the fountains. <br />ANSWER NO. 67 <br />Please see attached Section 131200 Water Features. <br />Page 16 of 20 <br />F:\Public Workst.ENGINEERING DIVISION PROJECTSU l3S-S County Park Intergeneratiional Rec Facility !Admim\ADDENDUMS\Addendum No. 4 I 1-12-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.