Laserfiche WebLink
ANSWER NO. 63 <br />This specification is applicable to the design intent. Included are (12) differing manufactures capable of fabricating <br />systems that meet or exceed the design intent for this project. The General Contractor is free to choose between <br />them and is expected to do so, to meet the intent and to provide competitive bids. <br />QUESTION NO. 64 <br />Specification 102113 (Plastic Toilet Compartments), line 2.2E, calls for Solid HDPE panels, while the finish schedule on <br />A1.02.20, TP -1, calls for composite phenolic panels. Please advise which material to include. <br />ANSWER NO. 64 <br />Phenolic Panels. <br />QUESTION NO. 65 <br />Specification 08 3513 (Folding Doors) indicates finish (2.1-D Panel Facing) to be selected from manufacturers full <br />range. Can you be more specific to finish, such as fabric, wood, metal, glass, etc. <br />ANSWER NO. 65 <br />Utilize Nanawall as basis of design; powder coat aluminum, with opaque glass. <br />QUESTION NO. 66 <br />Addendum #1 indicated scoreboard specification was indicated to be issued in pending addendum, please advise <br />an allowance to carry if specification is not issued prior to bid date. <br />ANSWER NO. 66 <br />See attached specification 116625 Gymnasium Scoreboard. <br />QUESTION NO. 67 <br />Item #82 (Fountain Assembly) on Itemized Bid Schedule only indicates the light manufacturer (Hydrel) and quantity <br />of lights (there is no Type 6, note may be a typo to match sheet E1.00.01 which indicates typical of 6) but no <br />information for the fountains. Please provide additional information on the fountains. <br />ANSWER NO. 67 <br />Please see attached Section 131200 Water Features. <br />Page 16 of 20 <br />F:\Public Workst.ENGINEERING DIVISION PROJECTSU l3S-S County Park Intergeneratiional Rec Facility !Admim\ADDENDUMS\Addendum No. 4 I 1-12-2014.doc <br />