Laserfiche WebLink
QUESTION NO. 68 <br />Sheet FP1.02.01 indicates fire sprinklers above and below suspended ceilings. Details 2, 4 and 5/ A1.05.01 indicates <br />fire proofing at metal joists. Please confirm fire sprinklers are not required above the suspended ceilings <br />ANSWER NO. 68 <br />NFPA 13 requires protection above and below open ceiling systems. Contractor shall provide sprinkler protection as <br />indicated on plans for a fully sprinklered facility. <br />QUESTION NO. 69 <br />Previous RFI response (Addendum 3 question 6 and 9) indicated sheet E1.03 has the detail 3for SLC Pole Base. <br />There is no sheet E1.03, detail 3 on sheet E1.03.01 is not for the SLC Pole Base. Please provide this detail. <br />ANSWER NO. 69 <br />Sheets E.01, E1.02, E1.03, E1.04 were issued previously as part of the civil/photometrics package dated 6/13/14. <br />This can be provided by architect to contractors. <br />QUESTION NO. 70 <br />Previous RFI response (Addendum 3 question 14) indicated General Contractor to determine fan type and size. <br />Please provide performance criteria for the fans (gym and corridor) if the General Contractor is to select the fans. <br />ANSWER NO. 70 <br />Fans are specified under specifications: <br />233401 HVLS HVAC Fans (84") <br />233402 HVLS HVAC Fans (10'-0") <br />233403 HVLS HVAC Fans (14'-0") <br />QUESTION NO. 71 <br />Please provide information for electrical box that is to be relocated per sheets C05 and C05 or confirm it will be <br />relocated by the applicable utility. <br />ANSWER NO. 71 <br />The architect does not have specific information regarding the existing electrical box located on the site, but it will <br />need to be addressed between the utility and general contractor to be resolved to meet the design intent of the <br />project. An electrical box remaining within a planned parking stall is not acceptable to the client. <br />Page 17 of 20 <br />F:\Public Worts\ENGINEERING DIVISION PROJECTSU 135-5 Courcy Part Imergeneratuonal. Rao Facility \AdmimWDDENDUMS\Addendum No. 4 11-12-2014.doc <br />