Laserfiche WebLink
4 <br />QUESTION <br />Has the project been funded? Or is funding forthcoming? <br />ANSWER <br />The project is fully funded. <br />QUESTION <br />What is the anticipated start date? <br />ANSWER <br />Sometime in January 2015. <br />QUESTION <br />Have permits been issued? <br />ANSWER <br />All permits have been received with the exception of the IRC Building Division permit. The reviewer <br />had a few comments that will be addressed with Dan Trbovich, Borrelli & Partners. <br />QUESTION <br />Are Davis -Bacon Wage rates required? <br />ANSWER <br />No. <br />QUESTION <br />Where is the transportation stop shelter located, mentioned in Specifications Division 10? The <br />'107343 -Transportation Stop Shelter' specification is Master Specification's specification title for the <br />pedestrian walk -way covers, not 'pre -fabricated bus stop shelters'. <br />ANSWER <br />The transportation stop shelter (a Master Spec headline) is actually the canopied walkways in the <br />pedestrian drop off area as indicated in the specs. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1135-S County Park Intergeneratiional Rec Facility\Admim\Meetings\Pre-bid Meeting Minutes <br />10-15-2014.doc <br />