My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-200A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-200A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 11:39:15 AM
Creation date
10/5/2015 1:22:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2014
Control Number
2014-200A
Agenda Item Number
12F.1
Entity Name
Kast Construction Company, LLC
Subject
Intergenerational Recreation Facility
Contract Documents and Specifications
Area
South County Regional Park
Project Number
1135
Bid Number
2014052
Supplemental fields
SmeadsoftID
14254
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />QUESTION <br />Standing seam roof system is mentioned — is this the same as a wall panel? <br />ANSWER <br />Standing seams goes along the lengths, almost like a grain, but the front face and the sides will be <br />"faced" with a paneling system. <br />QUESTION <br />Since there are no substitutions prior to award of bid, do the bid specs provide "or equals" to or is it <br />sole source? <br />ANSWER <br />There is no sole source — the basis of design is to give direction and intent and provide a number of <br />competitors so that bidders are bidding the same specifications. All bid items must meet all criteria <br />(materials, warranties, testing, etc) shown on specifications, plans and contract documents. Only <br />after bidding has been accepted and bid awarded, may substitutions be addressed. <br />No substitutions will be entertained until after the bid award. <br />QUESTION <br />Is the roofing system a system from the deck up, or is it individual components? <br />ANSWER <br />The preference for this project is a system — anytime there are seams in any system, they tend to fail. <br />QUESTION <br />Do we need to call out items in the bid? <br />ANSWER <br />All bid items must meet all criteria (materials, warranties, testing, etc.) shown on specifications, plans <br />and contract documents. No items need to be called out. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1135-S County Park Intergeneratiional Rec Facility\Admim\Meetings\Pre-bid Meeting Minutes <br />I0-15-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.