arbitration or other dispute resolution costs)
<br />arising out of or relating to any claim or action,
<br />legal or equitable, brought by any such owner
<br />or occupant against OWNER, ENGINEER, or
<br />any other party indemnified hereunder to the
<br />extent caused by or based upon
<br />CONTRACTOR's performance of the Work.
<br />B. Removal of Debris During Performance of the
<br />Work. During the progress of the Work CONTRAC-
<br />TOR shall keep the Site and other areas free from
<br />accumulations of waste materials, rubbish, and other
<br />debris. Removal and disposal of such waste materi-
<br />als, rubbish, and other debris shall conform to applica-
<br />ble Laws and Regulations.
<br />C. Cleaning. Prior to Substantial Completion of
<br />the Work CONTRACTOR shall clean the Site and
<br />make it ready for utilization by OWNER. At the com-
<br />pletion of the Work CONTRACTOR shall remove from
<br />the Site all tools, appliances, construction equipment
<br />and machinery, and surplus materials and shall
<br />restore to original condition all property not designated
<br />for alteration by the Contract Documents.
<br />D. Loading Structures: CONTRACTOR shall not
<br />load nor permit any part of any structure to be loaded
<br />in any manner that will endanger the structure, nor
<br />shall CONTRACTOR subject any part of the Work or
<br />adjacent property to stresses or pressures that will
<br />endanger it.
<br />6.12 Record Documents
<br />A. CONTRACTOR shall maintain in a safe place
<br />at the Site one record copy of all Drawings, Specifica-
<br />tions, Addenda, Written Amendments, Change
<br />Orders, Work Change Directives, Field Orders, and
<br />written interpretations and clarifications in good order
<br />and annotated to show changes made during
<br />construction. These record documents together with
<br />all approved Samples and a counterpart of all
<br />approved Shop Drawings will be available to ENGI-
<br />NEER for reference. Upon completion of the Work,
<br />these record documents, Samples, and Shop
<br />Drawings will be delivered to ENGINEER for OWNER.
<br />6.13 Safety and Protection
<br />A. CONTRACTOR shall be solely responsible
<br />for initiating, maintaining and supervising all safety
<br />precautions and programs in connection with the
<br />Work. CONTRACTOR shall take all necessary
<br />precautions for the safety of, and shall provide the
<br />necessary protection to prevent damage, injury or loss
<br />to:
<br />1. all persons on the Site or who may
<br />be affected by the Work;
<br />2. all the Work and materials and equip-
<br />ment to be incorporated therein, whether in
<br />storage on or off the Site; and
<br />3. other property at the Site or adjacent
<br />thereto, including trees, shrubs, lawns, walks,
<br />pavements, roadways, structures, utilities, and
<br />Underground Facilities not designated for
<br />removal, relocation, or replacement in the
<br />course of construction.
<br />B. CONTRACTOR shall comply with all applica-
<br />ble Laws and Regulations relating to the safety of
<br />persons or property, or to the protection of persons or
<br />property from damage, injury, or loss; and shall erect
<br />and maintain all necessary safeguards for such safety
<br />and protection. CONTRACTOR shall notify owners of
<br />adjacent property and of Underground Facilities and
<br />other utility owners when prosecution of the Work may
<br />affect them, and shall cooperate with them in the
<br />protection, removal, relocation, and replacement of
<br />their property. All damage, injury, or loss to any
<br />property referred to in paragraph 6.13.A.2 or 6.13.A.3
<br />caused, directly or indirectly, in whole or in part, by
<br />CONTRACTOR, any Subcontractor, Supplier, or any
<br />other individual or entity directly or indirectly employed
<br />by any of them to perform any of the Work, or anyone
<br />for whose acts any of them may be liable, shall be
<br />remedied by CONTRACTOR (except damage or loss
<br />attributable to the fault of Drawings or Specifications
<br />or to the acts or omissions of OWNER or ENGINEER
<br />or ENGINEER's Consultant, or anyone employed by
<br />any of them, or anyone for whose acts any of them
<br />may be liable, and not attributable, directly or
<br />indirectly, in whole or in part, to the fault or negligence
<br />of CONTRACTOR or any Subcontractor, Supplier, or
<br />other individual or entity directly or indirectly employed
<br />by any of them). CONTRACTOR's duties and
<br />responsibilities for safety and for protection of the
<br />Work shall continue until such time as all the Work is
<br />completed and ENGINEER has issued a notice to
<br />OWNER and CONTRACTOR in accordance with
<br />paragraph 14.07.6 that the Work is acceptable
<br />(except as otherwise expressly provided in connection
<br />with Substantial Completion).
<br />6.14 Safety Representative
<br />A. CONTRACTOR shall designate a qualified
<br />and experienced safety representative at the Site
<br />whose duties and responsibilities shall be the
<br />prevention of accidents and the maintaining and
<br />supervising of safety precautions and programs.