My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for <br />coordinating any exchange of material safety data <br />sheets or other hazard communication information <br />required to be made available to or exchanged be- <br />tween or among employers at the Site in accordance <br />with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protec- <br />tion of persons or the Work or property at the Site or <br />adjacent thereto, CONTRACTOR is obligated to act to <br />prevent threatened damage, injury, or loss. <br />CONTRACTOR shall give ENGINEER prompt written <br />notice if CONTRACTOR believes that any significant <br />changes in the Work or variations from the Contract <br />Documents have been caused thereby or are required <br />as a result thereof. If ENGINEER determines that a <br />change in the Contract Documents is required be- <br />cause of the action taken by CONTRACTOR in <br />response to such an emergency, a Work Change <br />Directive or Change Order will be issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings <br />to ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. All submittals will be identified as <br />ENGINEER may require and in the number of copies <br />specified in the General Requirements. The data <br />shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified perfor- <br />mance and design criteria, materials, and similar data <br />to show ENGINEER the services, materials, and <br />equipment CONTRACTOR proposes to provide and <br />to enable ENGINEER to review the information for the <br />limited purposes required by paragraph 6.17.E. <br />B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance <br />with the acceptable schedule of Shop Drawings and <br />Sample submittals. Each Sample will be identified <br />clearly as to material, Supplier, pertinent data such as <br />catalog numbers, and the use for which intended and <br />otherwise as ENGINEER may require to enable ENGI- <br />NEER to review the submittal for the limited purposes <br />required by paragraph 6.17.E. The numbers of each <br />Sample to be submitted will be as specified in the <br />Specifications. <br />C. Where a Shop Drawing or Sample is required <br />by the Contract Documents or the schedule of Shop <br />Drawings and Sample submittals acceptable to ENGI- <br />NEER as required by paragraph 2.07, any related <br />Work performed prior to ENGINEER's review and <br />approval of the pertinent submittal will be at the sole <br />expense and responsibility of CONTRACTOR. <br />D. Submittal Procedures <br />1. Before submitting each Shop <br />Drawing or Sample, CONTRACTOR shall have <br />determined and verified: <br />a. all field measurements, quantities, <br />dimensions, specified performance criteria, <br />installation requirements, materials, catalog <br />numbers, and similar information with <br />respect thereto; <br />b. all. materials with respect to intended <br />use, fabrication, shipping, handling, storage, <br />assembly, and installation pertaining to the <br />performance of the Work; <br />c. all information relative to means, <br />methods, techniques, sequences, and <br />procedures of construction and safety <br />precautions and programs incident thereto; <br />and <br />d. CONTRACTOR shall also have <br />reviewed and coordinated each Shop <br />Drawing or Sample with other Shop <br />Drawings and Samples and with the <br />requirements of the Work and the Contract <br />Documents. <br />2. Each submittal shall bear a stamp or <br />specific written indication that CONTRACTOR <br />has satisfied CONTRACTOR's obligations <br />under the Contract Documents with respect to <br />CONTRACTOR's review and approval of that <br />submittal. <br />3. At the time of each submittal, CON- <br />TRACTOR shall give ENGINEER specific <br />written notice of such variations, if any, that the <br />Shop Drawing or Sample submitted may have <br />from the requirements of the Contract <br />Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in <br />addition, shall cause a specific notation to be <br />made on each Shop Drawing and Sample sub- <br />mitted to ENGINEER for review and approval of <br />each such variation. <br />E. ENGINEER's Review <br />1. ENGINEER will timely review and <br />approve Shop Drawings and Samples in <br />accordance with the schedule of Shop <br />Drawings and Sample submittals acceptable to <br />00700 - General Conditions REV 04-07 <br />00700-24 <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & SPECS\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.