My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER. ENGINEER's review and <br />approval will be only to determine if the items <br />covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents <br />and be compatible with the design concept of <br />the completed Project as a functioning whole as <br />indicated by the Contract. Documents. <br />2. ENGINEER's review and approval <br />will not extend to means, methods, techniques, <br />sequences, or procedures of construction <br />(except where a particular means, method, <br />technique, sequence, or procedure of con- <br />struction is specifically and expressly called for <br />by the Contract Documents) or to safety <br />precautions or programs incident thereto. The <br />review and approval of a separate item as such <br />will not indicate approval of the assembly in <br />which the item functions. <br />3. ENGINEER's review and approval of <br />Shop -Drawings or Samples shall not relieve <br />CONTRACTOR from responsibility for any <br />variation from the requirements of the Contract <br />Documents unless CONTRACTOR has in <br />writing called ENGINEER's attention to each <br />such variation at the time of each submittal as <br />required by paragraph 6.17.D.3 and ENGI- <br />NEER has given written approval of each such <br />variation by specific written notation thereof <br />incorporated in or accompanying the Shop <br />Drawing or Sample approval; nor will any <br />approval by ENGINEER relieve CON- <br />TRACTOR from responsibility for complying <br />with the requirements of paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1. CONTRACTOR shall make correc- <br />tions required by ENGINEER and shall return <br />the required number of corrected copies of <br />Shop Drawings and submit as required new <br />Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in <br />writing to revisions other than the corrections <br />called for by ENGINEER on previous <br />submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule during all disputes or <br />disagreements with OWNER. No Work shall be <br />delayed or postponed pending resolution of any <br />disputes or disagreements, except as permitted by <br />paragraph 15.04 or as OWNER and CONTRACTOR <br />may otherwise agree in writing. <br />6.19 CONTRACTOR's General Warranty and <br />Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants <br />that all Work will be in accordance with the Contract <br />Documents and will not be defective. <br />CONTRACTOR's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper <br />maintenance or operation by persons other <br />than CONTRACTOR, Subcontractors, <br />Suppliers, or any other individual or entity for <br />whom CONTRACTOR is responsible; or <br />2. normal wear and tear under normal <br />usage. <br />B. CONTRACTOR's obligation to perform and <br />complete the Work in accordance with the Contract <br />Documents shall be absolute. None of the following <br />will constitute an acceptance of Work that is not in <br />accordance with the Contract Documents or a release <br />of CONTRACTOR's obligation to perform the Work in <br />accordance with the Contract Documents: <br />1. observations by ENGINEER; <br />2. recommendation by ENGINEER or <br />payment by OWNER of any progress or final <br />payment; <br />3. the issuance of a certificate of Sub- <br />stantial Completion by ENGINEER or any <br />payment related thereto by OWNER; <br />4. use or occupancy of the Work or any <br />part thereof by OWNER; <br />5. any acceptance by OWNER or any <br />failure to do so; <br />6. any review and approval of a Shop <br />Drawing or Sample submittal or the issuance of <br />a notice of acceptability by ENGINEER; <br />7. any inspection, test, or approval by <br />others; or <br />S. any correction of defective Work by <br />OWNER. <br />6.20 Indemnification <br />A. To the fullest extent permitted by Laws and <br />Regulations, CONTRACTOR shall indemnify and hold <br />00700 - General Conditions REV 04-07 <br />00700-25 <br />F:\Engineering\Capital Projects\0455 8th St SIDEWALK FROM 18th COURT TO OLD DIXIE\0455 CONTRACT DOCS & SPECS\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.