Laserfiche WebLink
3. The CONTRACTOR shall receive no additional compensation for overtime work, <br />i.e., work in excess of eight hours in any one calendar day or 40 hours in any one <br />calendar week, even though such overtime work may be required under <br />emergency conditions and may be ordered by the ENGINEER in writing. <br />4. All costs of inspection and testing performed during overtime work by the <br />CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br />OWNER to deduct the costs of all such inspection and testing from any <br />payments otherwise due the CONTRACTOR. <br />5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br />from overtime work by the CONTRACTOR, which is allowed solely for the <br />convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br />credit given to OWNER to deduct all such costs from any payments otherwise <br />due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C: <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br />entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br />account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br />other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />A. The OWNER has obtained the following permits (copies of these permits are <br />contained in Appendix "A"): <br />B. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />C. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -13.03 Test and Inspections <br />SC -13.03.13. Delete the first sentence of paragraph GC -13.03.8 in its entirety, and insert the <br />following sentences in its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />00800-6 <br />00800 - Supplementary Conditions 06-09 rev.doc <br />00800 F:\Public Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk improvements 18th Ct to Old <br />DixieWdmim\bid documents\00800 - Supplementary Conditions 06-09 rev.doc <br />