applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuant to <br />paragraph 13.04.13 shall be paid as provided in said paragraph 13.04.13; <br />3. tests otherwise specifically provided in the Contract Documents. <br />13.05 OWNER May Stop the Work <br />SC -13.05.A. Delete paragraph GC -13.05.A in its entirety and insert the following paragraph in its <br />place: <br />A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled <br />workers or suitable materials or equipment, or fails to comply with permit <br />requirements, or fails to comply with the technical specifications, or fails to <br />perform the Work in such a way that the completed Work will conform to the <br />Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br />portion thereof, until the cause for such order has been eliminated; however, this <br />right of OWNER to stop the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of CONTRACTOR, any <br />Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br />employee or agent of any of them. <br />14.02 Progress Payments <br />SC -14.02.13.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph <br />in its place: <br />d. ENGINEER has actual knowledge of the occurrence of any of the events <br />enumerated in paragraph 15.02.A; or <br />SC -14.02.13.5. Add the following sentences at the end of paragraph GC -14.02.6.5: <br />e. OWNER has been required to pay ENGINEER additional compensation because <br />of CONTRACTOR delays or rejection of defective Work; or <br />OWNER has been required to pay an independent testing laboratory for <br />subsequent inspections, tests, or approvals taken after initial failing inspections, <br />tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C.1 in its entirety and insert the following paragraph <br />in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR ,according to the Local <br />Government Prompt Payment Act. F.S. 218.70 et. seq. <br />SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Conditions, <br />delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br />00800-7 <br />00800 - Supplementary Conditions 06-09 rev.doc <br />00800 FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old <br />DixieWdmim\bid documents\00800 - Supplementary Conditions 06-09 rev.doc <br />