My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION -108 — RECORD DRAWINGS/AS-BUILT DRAWINGS <br />GENERAL <br />A. Maintain and provide the ENGINEER with record documents as specified below, <br />except where otherwise specified or modified in Divisions the Supplementary <br />Conditions. <br />B. Maintenance of Documents: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following: Drawings, Specifications, Addenda, approved <br />Shop Drawings, samples, photographs, Change Orders, other modifications of <br />Contract Documents, test records, survey data, Field Orders, and all other <br />documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available at all times for inspection by ENGINEER and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove them <br />from the field office. <br />C. Recording: <br />1. Label each document "PROJECT RECORD" in 2 -inch high printed letters. <br />2. Keep record documents current. <br />3. Do not permanently conceal any Work until required information has been <br />recorded. <br />RECORD AS -BUILT DRAWINGS <br />01 <br />A <br />During the entire construction operation, the CONTRACTOR shall maintain <br />records of all deviations from the Drawings and Specifications and shall prepare <br />there from "record" drawings showing correctly and accurately all changes and <br />deviations from the work, made during construction to reflect the work as it was <br />actually constructed. <br />Record/As-Built survey shall be performed and subsequent plans prepared by a <br />registered Professional Surveyor and Mapper in the state of Florida and certified <br />per standards as set forth within Florida Statutes, Administrative code and <br />Minimum Technical Standards forthat type of survey. All said surveying mentioned <br />above shall be performed under the direct supervision of a registered Professional <br />Surveyor and Mapper in the state of Florida accordingly. <br />The following items are required to be shown on County project Record/As-Built <br />drawings submitted to ENGINEER: <br />As per Chapter 472, Florida Statutes and Chapter 61G17-6.007 Florida <br />Administrative Code As -Built — Record — Specific Purpose Surveys: <br />01025-13 Technical Specifications <br />C•\D. �hlln \A/nr4e\FAIl�IAIFFgIAIl� ISI\/ICIf1N OW) IF!`TQ%ndFF_Q#h Qf—f QW—Ur Imm—m—f. 1 Afh ('.f fn (1W Ilivio\A'Imim\hiA <br />
The URL can be used to link to this page
Your browser does not support the video tag.