Laserfiche WebLink
A Professional Surveyor and Mapper licensed in the state of Florida shall provide <br />an adequate Record/As-Built survey as it relates to the regulations and standards <br />established for said surveys. <br />AND <br />Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated <br />in such a way that the location of the construction may be compared with the <br />construction plans. Clearly shows by symbols, notations, or delineations, those <br />constructed improvements located by the survey. <br />1. Right-of-way Swale/Drainage — All culvert inverts, elevations and station <br />offsets; inlet grate and bottom elevations; swale beginning and end bottom <br />elevations; and highs and lows along top of bank. Size of Swale. <br />2. Pipe Culvert/PVC Sleeves — All inverts, stations and offsets. <br />3. Outfalls — All pipe inverts, elevations and station offsets, weir box elevations, <br />weir elevation, and sizes. <br />4. Roadway/Off Site Drainage — All inverts, elevations and station offsets; <br />manhole top elevation; grate top elevations. <br />5. Retention Ponds — Perimeter elevations, grade breaks, depths, and calculate <br />pond area at control elevation and grade breaks above water surface. <br />6. Roadway: <br />a. Stations and offset related to controlling baseline and elevations of all <br />structures, side street and major driveway radius returns (edge of <br />pavement), bends and/or change in direction of roadway alignment, OR <br />minimum at 1000' intervals along roadway alignment. <br />b. Elevations along Profile Grade Line (PGL), of all edge of pavements either <br />side of Profile Grade Line (PGL), at medians at the high/low and PVI <br />points along Profile Grade Line (PGL). <br />c. All final Elevations to be plotted on PGL AND Plan - Profile sheets as <br />applicable. <br />d. Elevations of edge of pavement and flow line at curb inlets and on the <br />adjacent edge of pavement at curb inlets. <br />SURVEY CONTROL <br />1. Install/re-establish: It shall be the contractor's responsibility to hire a <br />Professional Surveyor and Mapper as defined per Chapter 472, Florida <br />Statutes, to replace any horizontal and vertical control shown on the <br />engineering plans that was destroyed during construction. <br />2. New roadway alignment control points (Survey Baseline or controlling line and all <br />points as indicated on the plans or control sheet) upon final roadway completion. <br />Include all intersections and side streets. State Plane Coordinates and <br />elevations for all control points. <br />3. Either if shown on plans or not: Any Public Land Corner or Governmental <br />Survey Control point(s),vertical control (bench marks), property corners <br />destroyed and/or disturbed during the scope of the project shall be properly re- <br />established as per standards as set forth within Florida Statutes, Administrative <br />01025-14 Technical Specifications <br />FAPublic WorksIENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old DixieWdmimXbid <br />