My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-139
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:58:27 PM
Creation date
10/5/2015 9:01:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bases and sand bituminous road mixes, the finished grading template is the top of the <br />finished base, shoulders and slopes. For all other bases and rigid pavement, the finished <br />grading template is the finished shoulder and slope lines and bottom of completed base or <br />rigid pavement. <br />120-2.2 Lateral Ditch Excavation: Lateral Ditch Excavation consists of all excavation <br />of inlet and outlet ditches to structures and roadway, changes in channels of streams, and <br />ditches parallel to the roadway right-of-way. Dress lateral ditches to the grade and cross- <br />section shown in the plans. <br />120-2.3 Channel Excavation: Channel Excavation consists of the excavation and <br />satisfactory disposal of all materials from the limits of the channel as shown in the plans. <br />120-2.4 Excavation for Structures and Pipe: Excavation for Structures consists of <br />the excavation for bridge foundations, box culverts, pipe culverts, storm sewers and all other <br />pipe lines, retaining walls, headwalls for pipe culverts and drains, catch basins, drop inlets, <br />manholes, and similar structures. <br />120-3 Excavation Requirements. <br />120-3.1 Excavation and Replacement of Unsuitable Materials: Where rock, muck, <br />clay, or other material within the limits of the roadway is unsuitable in its original position, <br />excavate such material to the cross-sections shown in the plans or indicated by the Engineer, <br />and backfill with suitable material. Shape backfill materials to the required cross-sections. <br />Where the removal of plastic soils below the finished earthwork grade is required, meet a <br />construction tolerance of ± 0.2 foot in depth and ± 6 inches (each side) in width. <br />120-3.2 Lateral Ditch Excavation: Excavate inlet and outlet ditches to structures and <br />roadway, changes in channels of streams and ditches parallel to the roadway. Dress lateral <br />ditches to the grade and cross-section shown in the plans. <br />120-3.3 Channel Excavation: Excavate and dispose of all materials from the limits of <br />the channel as shown in the plans. Excavate for bridge foundations, box culverts, pipe <br />culverts, storm sewers and all other pipe lines, retaining walls, headwalls for pipe culverts and <br />drains, catch basins, drop inlets, manholes, and similar structures. <br />120-3.4 Excavation for Structures and Pipe. <br />120-3.4.1 Requirements for all Excavation: Excavate foundation pits to permit <br />the placing of the full widths and lengths of footings shown in the plans, with full horizontal <br />beds. Do not round or undercut corners or edges of footings. Perform all excavation to <br />foundation materials, satisfactory to the Engineer, regardless of the elevation shown on the <br />plans. Perform all excavation in stream beds to a depth at least 4 feet below the permanent <br />bed of the stream, unless a firm footing can be established on solid rock before such depth is <br />reached, and excavate to such additional depth as may be necessary to eliminate any danger <br />of undermining. Wherever rock bottom is secured, excavate in such manner as to allow the <br />solid rock to be exposed and prepared in horizontal beds for receiving the masonry. Remove <br />all loose and disintegrated rock or thin strata. Have the Engineer inspect and approve all <br />foundation excavations prior to placing masonry. <br />120-3.4.2 Earth Excavation: <br />120-3.4.2.1 Foundation Material other than the Rock: When masonry <br />is to rest on an excavated surface other than rock, take special care to avoid disturbing the <br />bottom of the excavation, and do not remove the final foundation material to grade until just <br />before placing the masonry. In case the foundation material is soft or mucky, the Engineer <br />may require excavation to a greater depth and to backfill to grade with approved material. <br />01025-22 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old Dixie\Admim\bid <br />documents\Technical Speciflcations.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.