Official Document Type
Contract
Approved Date
06/01/2010
Control Number
2010-139
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
8th Street Sidewalk Improvements 18th Court to Old Dixie
Area
8th Street, 18th Court to Old Dixie Highway
Project Number
0455
Bid Number
2010019
Supplemental fields
SmeadsoftID
8564
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120-3.4.2.2 Foundation Piles: Where foundation piles are used, <br />complete the excavation of each pit before driving the piles. After the driving is completed, <br />remove all loose and displaced material, leaving a smooth, solid, and level bed to receive the <br />masonry. <br />120-3.4.2.3 Removal of Obstructions: Remove boulders, logs, or any <br />unforeseen obstacles encountered in excavating. <br />120-3.4.3 Rock Excavation: Clean all rock and other hard foundation material, <br />remove all loose material, and cut all rock to a firm surface. Either level, step vertically and <br />horizontally, or serrate the rock, as may be directed by the Engineer. Clean out all seams, and <br />fill them with concrete or mortar. <br />120-3.4.4 Pipe Trench Excavation: Excavate trenches for pipe culverts and <br />storm sewers to the elevation of the bottom of the pipe and to a width sufficient to provide <br />adequate working room. Remove soil not meeting the classification specified as suitable <br />backfill material in 120-8.3.2.2 to a depth of 4 inches below the bottom of the pipe elevation. <br />Remove rock, boulders or other hard lumpy or unyielding material to a depth of 12 inches <br />below the bottom of the pipe elevation. Remove muck or other soft material to a depth <br />necessary to establish a firm foundation. Where the soils permit, ensure that the trench sides <br />are vertical up to at least the mid -point of the pipe. <br />For pipe lines placed above the natural ground line, place and compact <br />the embankment, prior to excavation of the trench, to an elevation at least 2 feet above the <br />top of the pipe and to a width equal to four pipe diameters, and then excavate the trench to <br />the required grade. <br />120-4 Disposal of Surplus and Unsuitable Material. <br />120-4.1 Ownership of Excavated Materials: Dispose of surplus and excavated <br />materials as shown in the plans or, if the plans do not indicate the method of disposal, take <br />ownership of the materials and dispose of them outside the right-of-way. <br />120-4.2 Disposal of Muck on Side Slopes: As an exception to the provisions of <br />120-4.1, when approved by the Engineer, muck (A-8 material) may be placed on the slopes, <br />or stored alongside the roadway, provided there is a clear distance of at least 6 feet between <br />the roadway grading limits and the muck, and the muck is dressed to present a neat <br />appearance. In addition, this material may also be disposed of by placing it on the slopes <br />where, in the opinion of the Engineer, this will result in an aesthetically pleasing appearance <br />and will have no detrimental effect on the adjacent developments. Where the Engineer <br />permits the disposal of muck or other unsuitable material inside the right-of-way limits, do not <br />place such material in a manner which will impede the inflow or outfall of any channel or of <br />side ditches. The Engineer will determine the limits adjacent to channels within which such <br />materials may be disposed. <br />120-4.3 Disposal of Paving Materials: Unless otherwise noted, take ownership of <br />paving materials, such as paving brick, asphalt block, concrete slab, sidewalk, curb and <br />gutter, etc., excavated in the removal of existing pavements, and dispose of them outside the <br />right-of-way. If the materials are to remain the property of the Agency, place them in neat piles <br />as directed. Existing limerock base that is removed may be incorporated in the stabilized <br />portion of the subgrade. If the construction sequence will allow, incorporate all existing <br />limerock base into the project as allowed by the Contract Documents. <br />120-4.4 Disposal Areas: Where the Contract Documents require disposal of <br />excavated materials outside the right-of-way, and the disposal area is not indicated in the <br />Contract Documents, furnish the disposal area without additional compensation. <br />01025-23 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\0455-8th Street Sidewalk Improvements 18th Ct to Old DixieWdmim\bid <br />documents\Technical Specifications.doc <br />