My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/1981
CBCC
>
Meetings
>
1980's
>
1981
>
8/5/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:53:13 AM
Creation date
6/11/2015 1:36:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/05/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 5 1981 <br />CHANCE <br />OWNER <br />❑ <br />ARCHITICT <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />AJA DOCUMENT G701 <br />OTHER <br />BOOK 4 7 PAGE 72 <br />PROJECT: Indian River County CHANCE ORDER NUMBER: 61 <br />tname, address) County Administration Bldg. <br />10 (Contractor) <br />ARCHITECT'S PROJECT NO: 9363 <br />F Reinhold Construction Inc. <br />P.O.Box 666 CONTRACT FOR Additions and Renovations <br />_ <br />Cocoa, FL 32922 <br />L CONTRACT DATE. 4/2/80 <br />You are directed to make the follov.-ing changes in this Contract - <br />CP -101 Provide 110 power source for east and we,t irrigation controls (2) $3,955.26 <br />(east to be located on east wall of commission room and west to be <br />located on west wall of generator room-Rm N115.) <br />Provide electrical in lieu of hydraulic controls for irrigating at <br />no cost. <br />Provide heads and #iping for irrigation in right of way.(between <br />sidewalk and curb) along 26th street line. (not past 18th avenue) <br />At the request of the owner. <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />,viii be added to the contract that is directly related to this change <br />order. The eontractot will be paid for the additional required days <br />at the rate of$300.00 (three hundred) per day for fixed overhead <br />casts. The number of days requested are not reflected in the attached <br />&-currents. <br />The original Contract Sum Has . . . . . . . . . . . . . . . . . . . . S 2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 336,075.35: <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . S 3,o84,075.35 <br />The Contract Sum will be (increased) by this Change Order . .$ 3,955.26 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . $ 3,088,030.61 <br />The Contract Time will be (Increased) (decreased) (unchanged) by ( - - -) Dais <br />TFie Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF & EDDY <br />PrHITET <br />Elio. Dixie Highway <br />Address <br />Coral <br />�.Gables, FL 33134 <br />BY <br />DATE <br />REINHOLD CONSTRUCTION INC. <br />cP.UR o °�i66 <br />Address <br />Cocoa, F1 32922 <br />INDIAN RIVER COUNTY <br />14th Ave <br />Address <br />Verq Beach, FL 32960 <br />BY <br />DATE �.' I <br />DATE <br />AIA DOCUMENT G791 • CHANGE ORDER - APRIL 1970 EDITION • AIAC • m 1970 - THE O%j PACE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, O.C. 20006 <br />CHANGE ORDER N0. 62 - COUNTY ADMINISTRATION BUILDING <br />MR. KONTOULAS EXPLAINED THAT THIS INVOLVES THE EMERGENCY <br />GENERATOR FOR THE ADMINISTRATION BUILDING. IN THE BEGINNING, WE <br />ISSUED CHANGE BORDER No. 4'TO TAKE THE OLD GENERATOR OUT OF THE BUILDING <br />AND HAVE IT REWORKED AND TESTED. <br />DURING THE ONE YEAR LAPSE OF TIME, <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.