My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/1981
CBCC
>
Meetings
>
1980's
>
1981
>
8/5/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:53:13 AM
Creation date
6/11/2015 1:36:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/05/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 4,; <br />7PAGE �� <br />FA <br />_'HANGEOWNER <br />ARCHITECT ECT <br />)RDER CONTRACTOR <br />FIELD ❑ <br />1 DOCOMINT G701 OTHER <br />'c))ECT: Indian River County CHANGE ORDER NUMBER: 26 <br />n,c, address) Courthouse Bldg. <br />► tContractor) <br />F <br />Reinhold Construction Inc. <br />P.o.Box 666 <br />Cocoa, FL 32922 <br />ARCIMECT'S PROJECT NO: 9364 <br />CONTRACT FORAdd i t ions & Renovations <br />L J CONTRACT DATE: 4/2/80 <br />.,j are directed to make the following changes in this Contract: <br />P_116 s 46A At the owners request provide an exterior fire escape <br />at north courtroom 210 per the attached documents (item fl). <br />Provide fire exit light over door at new exit (fire escape) <br />interior. Provide wall bracket light fixture, exterior, over <br />fire escape door. <br />'he -reposed changes in the ►,nrk may result in additional time <br />.e u;red beyond the contract completion date. Additional time <br />,iili be added to the contract that is directly related to this change <br />)rder. The contractof will be paid for the additional required days <br />)t the rate ofS300.00 (three hundred) per day for fixed overhead <br />:csts. The number of days requested are not reflected in the attached <br />Jocuments, <br />$15,139.80 <br />;he original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 689,000.00 <br />.et change by previous Change Orders . . . . . . . . . . . . . . . . . . S 153,882-79 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . S 842,882.79 <br />;he Contract Sum will be (increased) K*Xr)¢X*)dXXM(36YQM by this Change Order . . . S 15,139-80 <br />i tic new Contract Sum including this Change Order will be . . . . . . . . . . . S 858,022.59 <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />--.e Date of Completion as of the date of this Change Order therefore is <br />DNNELL METCALF�_E0D.Y RE(_NHOLD CONSTRUCTION INC <br />1A20tEfo.Dixie Hlg`tway T:`t3 0 656 — — <br />c:dress Address <br />Coral Gables, FL 33134 Cocoa, FL 32922 <br />:)ATE [, 7; <br />BY / t=�� <br />a <br />DATE <br />INDIAN RIVER COUNTY <br />Il 4`,R 14th Avenue <br />Address <br />Vero,B�bch, FL _3296 <br />AIA DOCUMENT 0701 • CHANGF ORDER • APRIL 1970 EDITION • AIAS I Z: 1970 • THE ONE PAGE <br />N%4[FIC AN ItiSTITUTE Of ARCHITECTS, 1735 NAW YORK AVE., NW, WASHINGTON, D.C. I0006 <br />62 <br />M M M <br />
The URL can be used to link to this page
Your browser does not support the video tag.