My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/19/1981
CBCC
>
Meetings
>
1980's
>
1981
>
8/19/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:38:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/19/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOHN ROBBINS, ENGINEER, APPROACHED THE BOARD AND INTRODUCED <br />THE FOLLOWING MEMBERS OF HIS STAFF: RANDY MOSBY, LYNN MUELLER, AND <br />GUY WILLS. MR. ROBBINS THEN REVIEWED THE FOLLOWING INFORMATION <br />REGARDING BID NUMBERS 87, 88 AND 89: <br />TO: The Honorable Members of ®ATE: August 13, 1981 FILE: <br />the Board of County Commissioners <br />'_' J <br />FROM: Neil A. Nelson <br />County Administrator <br />SUBJECT: South County Water System - <br />Award of Contracts <br />REFERENCES: <br />On July 14, 1981, bids were received for Parts I, II, and III of the South <br />County Water System. All bids have been tabulated and reviewed by the <br />County's consulting engineers, Sverdrup & Parcel and Associates, Inc. and <br />the following contract award recommendations have been submitted. <br />PART DESCRIPTION RECOMMENDED BID AMOUNT BUDGET/ESTIMATE <br />I Distribution System <br />II Reverse Osmosis Equip. <br />III Reverse Osmosis Support <br />Facilities <br />Scarborough Const. $902,097.35 $1,316,908.50 <br />Inc. <br />Water Services of $1,217,091.00 $1,597,660.00 <br />America, Inc. <br />Gulf Contractors, $3,455,100.00 $3,414,247.00 <br />Inc. <br />Total - . $5,574,288.35 $6,328,815.50 <br />Although the recommended low bidders are approximately $754,527.15 below the <br />engineers' latest estimates, the total project costs are estimated to exceed <br />available funds by $425,808.81. <br />ALTERNATIVES AND ANALYSIS <br />Sverdrup and Parcel has submitted an extensive review of available alternatives, <br />which is attached to this report, along with the complete bid tabulations. The <br />Administration has reviewed this material and is in concurrence with the analysis <br />presented by Mr. Robbins. In -addition, the option of rejecting any or all bids <br />and directing the engineers to redesign the project to comply with the available <br />budget is available to the Board. However, this option would cause further <br />delays in bringing the system on line and could result in higher total costs as <br />deleted items are added or enlarged at later dates. <br />AUG 191991 BOOT( .47 PAcf 208 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.