Laserfiche WebLink
BOOK 47 PACE 363 <br />i <br />RE CHANGE ORDER #66, MR. KONTOULAS REPORTED THAT THEY <br />ARE PROVIDING TWO SAFETY DRIP PANS FOR TWO AIR HANDLING UNITS <br />LOCATED ABOVE THE STAIRS IN THE TWO STORY PORTION OF THE <br />BUILDING WHERE THE FINANCE DEPARTMENT WILL BE LOCATED., THE <br />EXISTING FANS WHICH ARE RUSTED OUT ARE LEAKING AND CAUSING <br />DAMAGE TO THE CEILINGS AND WALLS. THESE UNITS APPARENTLY WERE <br />DROPPED IN BEFORE THE ROOF WAS COMPLETED, AND THE REPLACEMENT <br />FANS ARE TO BE LOCATED UNDER THE STRUCTURAL MEMBERS WITH AN OUTLET <br />TO THE OUTSIDE WALL. THEY ARE ABOUT 5' X 5' IN SIZE. <br />CONSIDERABLE DISCUSSION FOLLOWED AS TO THE PROPOSED COST <br />OF $5,000, AND MR. KONTOULAS EXPLAINED THAT THIS ALSO INVOLVES <br />SUCH OTHER THINGS AS DAMPERS, PAINTING, WELDING MATERIALS, <br />DEMOLITION, AND A FUSABLE LINK FOR THE LOUVERED GRILL IN THE FIRE <br />DOOR, WHICH WOULD MELT AND DROP THE LOUVER IN CASE OF FIRE. <br />THE 50ARD FELT THEY HAD NOT BEEN SUPPLIED SUFFICIENT <br />INFORMATION. ADMINISTRATOR NELSON STATED THAT HIS STAFF WILL <br />SUPPLY THE BOARD ANY BACK UP MATERIAL THEY DESIRE,BUT THEY HAD <br />BEEN TRYING TO CUT BACK AS PROPOSED IN THE RECENT EFFORT TO <br />REVISE THE AGENDA BY ELIMINATING UNNECESSARY MATERIAL. <br />IT WAS FELT THAT THE BOARD DOES NOT NEED THE ENTIRE CHANGE <br />ORDER DOCUMENT, BUT THAT SOME SIMPLE WORDING COULD HAVE BEEN <br />ADDED GIVING A MORE COMPLETE EXPLANATION OF WHAT WAS INVOLVED. <br />INQUIRY FOLLOWED AS TO THE NUMBER OF CHANGE PROPOSALS <br />PENDING AND ANTICIPATED, AND MR, KONTOULAS STATED THERE WERE <br />ONLY TWO THAT HE KNEW OF. <br />MR,SNODGRASS OF PEINHOLD CONSTRUCTION REPORTED THEY HAD <br />BEEN AUTHORIZED BY THE ARCHITECT TO DO TWO MORE ITEMS.ON <br />A TIME AND MATERIALS BASIS, AND HE COULD SAY THAT IT IS NOT <br />GOING TO BE A MINOR AMOUNT OF MONEY. HE BELIEVED THERE HAD <br />BEEN SOME DISCUSSION BEFORE THAT THERE WAS SOME MECHANICAL WORK <br />THAT HAD TO BE DONE RELATING TO OLD PIPING THAT WAS TO BE REUSED, <br />BUT IS LEAKING, ETC, <br />ADIMISTRATOR NELSON INFORMED THE BOARD THAT MECHANICAL <br />TUBING, PIPING, VALVES, ETC., IS INVOLVED. THE ARCHITECT DID <br />NOT AGREE WITH THE CONTRACTOR ON THE PRICE AND COULD NOT <br />AGREE WHETHER THE CONTRACT DOCUMENTS COVERED THIS WORK. <br />b, • M, <br />Lb. <br />