Laserfiche WebLink
CHANGE <br />ORDER <br />AIA DOCUMENT G701 <br />OWNER <br />❑ <br />ARCHITECT <br />❑ <br />CONTRACTOR <br />o <br />FIELD <br />❑ <br />OTHER <br />PROJECT: • Indian River County <br />(name, address) County Administration Bldg. <br />TO (Contractor) <br />r Reinhold Construction Inc. <br />P,O.Box 666 <br />Cocoa, FL 32922 <br />L <br />CHANGE ORDER NUMBER. 65 <br />ARCHITECT'S PROJECT NO: 9363 <br />CONTRACT FOR: Add i t ions and Renovations <br />. I CONTRACT DATE:4/2/80 <br />You are directed to make the following changes in this Contract: <br />CP -108 Remove 4 (four) pumps located on east wall of old boiler room. $4,570.66 <br />Tie existing 6" CHWS and Return lines in to pump discharge and <br />suction lines. <br />Provide 3/4" makeup water lines, complete with PRV and bypass <br />for quick fill, also provide 3/4" valve with plug for treatment <br />of boiler and chilled water. Repair leaks in chilled and hot water <br />piping undergroung. <br />Repairs to be made by cutting lines leading to dead ends and capping; <br />due to unforeseen coriditions. <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractot will be paid for the additional required days <br />at the rate of $300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . S 2 , 748 , 000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 340,679.85 <br />The Contract Sum prior to this Change Order was .. . . . . . . . . . . . $ 3,088,679.85 <br />The Contract Sum will be (increased) W6r*XsW1 *Xby this Change Order . . . S 4,570.66 . <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 3,093,250-51 <br />The Contract Time will be (increased) (decreased) (unchanged) by (- - -) Days. <br />The Date of Completion as of the date of this Change Order therefore is , <br />CONNELL METCALF & EDDY <br />Iq�c�Vbo <br />P-, Dixie Mghway <br />Address <br />Coral Gablef». FL 33134 <br />BY <br />DATE <br />REiNHOLD CONSTRUCTION INC. <br />CDNjR CTO <br />Address <br />Cocoa, F1 32922 <br />By <br />DATE <br />AIA DOCUMENT GM - CHANCE ORDER - APRIL 1970 EDITION - AIA® - ® 1970 - THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 200x6 <br />L- <br />at <br />INDIAN RIVER COUNTY <br />OV49 14th Ave <br />Addre <br />V,errolBeach, FL_ ,32960 <br />TE <br />ONE PACE <br />600K 47 PAr,E 362 <br />