My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:40:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMISSIONER FLETCHER (QUESTIONED THE IMPACT OF <br />THIS COST ON THE TAXPAYER WHO IS NOT ON THIS SYSTEM, AND <br />COMMISSIONER SCURLOCK STATED THAT THE COST OF THE PROJECT <br />WILL BE BORNE BY THE PEOPLE RECEIVING THE SERVICE AND THEY <br />WILL BE ZERO IMPACT ON ANY OTHER TAXPAYER. <br />COMMISSIONER FLETCHER REQUESTED THAT THE RECORD REFLECT <br />THIS STATEMENT, <br />DISCUSSION ENSUED AS TO THE FACT THAT THE $74$,000 FIGURE <br />DOES NOT INCLUDE THE COST OF THE SUB -AQUEOUS CROSSING, AND <br />ENGINEER ROBBINS EXPLAINED THAT THE PROJECT WAS PURPOSELY DONE <br />IN PHASES BECAUSE THE EXISTING CUSTOMER BASE WAS NOT LARGE ENOUGH <br />TO AMORTIZE A WATER REVENUE BOND PROGRAM FOR THE WHOLE SOUTH BEACH, <br />THEY, THEREFORE, DEVELOPED THE PHASED APPROACH, WHICH INVOLVED <br />WORKING OUT AN AGREEMENT WITH THE CITY OF VERO PEACH TO <br />UTILIZE THE EXISTING SYSTEM FOR A SPECIFIED PERIOD OF TIME AND <br />ALLOW CONNECTIONS TO THE SYSTEM TO INCREASE THE BASE. BY ALLOWING <br />THAT TO TAKE PLACE NOW AND SIGNING DEVELOPER AGREEMENTS, WE <br />COULD COMMIT TO A LARGER BOND PACKAGE. IN OTHER WORDS, WE WOULD <br />ASSUME THE CITY'S PRESENT BASE PLUS 250 ADDITIONAL, AND OF THE 250 <br />ADDITIONAL, 100 COULD COME ON THE SYSTEM IMMEDIATELY WHILE <br />WE AWAIT CONSTUCTION. <br />QUESTION AROSE AS TO WHETHER THE 27 EXISTING RESIDENTS WHO <br />WOULD BE ON THE 2" LINE WOULD BE PART OF THE -1.00,AND IT WAS FELT <br />THEY SHOULD BE, <br />ATTORNEY COLLINS NOTED THAT UTILITY DIRECTOR LINER HAS <br />BROUGHT UP A QUESTION REGARDING A CONNECTION CHARGE THE CITY WILL <br />CHARGE IN THE INTERIM PERIOD, AND HE WOULD LIKE TO GET THE DOLLAR <br />AMOUNT FROM THE CITY TO INCLUDE IN THE AGREEMENT ON PAGE 3, <br />PARAGRAPH B. HE BELIEVED WE NEED TO MEET WITH THE CITY AGAIN. <br />INTERGOVERNMENTAL COORDINATOR THOMAS POINTED OUT THAT <br />BEFORE ANY AGREEMENT IS REACHED HE BELIEVED IT SHOULD BE SUBJECT <br />TO A FINAL TAKE-OUT LETTER FROM FMH!! ON THE SOUTH COUNTY I'.!ATER <br />PLANT, AND ftTORNEY COLLINS AGREED THAT SHOULD BE ADDED. <br />33 <br />Boox 47 PApf 37o <br />
The URL can be used to link to this page
Your browser does not support the video tag.