My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:40:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r SEP 2 1981 <br />CHANGEOWNER <br />ARCH17 <br />ARCHIT[CT <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />t'.g DCS( ('Aff NT 0701 <br />OTHER <br />^nUiECT: Indian River County <br />County Administration Bldg. <br />i 0, (Contractor <br />9 <br />CHANGE ORDER NUMBER. 65 <br />PAPE 391 <br />r <br />Reinhold Construction inc. <br />ARCHITECT'S PF'O)ECT NO. 9363 <br />P.O.Sox 666 CONTRACT JOR.Add itions and Renovations <br />Cocoa, FL 32922 <br />L_ CONTRACT Dr;TE:4/2/80 <br />are directed to make the following changes in this Contract <br />C7'-10" Remove 4 (four) pumps located on east wall of old boiler room. $4,570.66 <br />l'ie existing 6" CHrlS and Return lines in to pump discharge and <br />suction lines. <br />Provide 3/4" makeup water lines, complete with PRV and bypass <br />for quick fill, also provide 3/4" valve with plug for traatment <br />c,,f boiler and chilled water. Repair leaks 1n chilled and hot water <br />piping undergroung. <br />Repairs to be made by cutting lines leading to dead ends and capping, <br />due to unforeseen coAditlons. <br />Tire proposed changes in the vnrk may result in additional time <br />re, 6 reed beyond the contract completion date. 'Additional time <br />:dill be added to the contract that Is directly related to this change <br />cyder. The contractot will be paid for the additional required days <br />.at the rate ofS300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The crig;nal Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2 , 748,000. 00 <br />P,et change by previous Change Orders . . . . . . . . . . . . . . . . . . S 340,679.85 <br />t he Contract Sum prior to this Change Order was . . . . . . . . . . . . . 3 .088 ,679.85 <br />,he Contract Sum will be (increased) &164 WX4RAI*Uby this Change Order . . . S 4,570.66 <br />The nev, Contract Sum including this Change Order will be . . . . . . . . . . . S 3,093,250.51 <br />The Contract Time. will be (increased) (decreased) (unchanged) by (- - -) Dais <br />'The Dare of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF & EDDY <br />avt'utTC <br />_2iJo. Dixie Highway <br />address <br />Coral Gablea), FL 33134 <br />DATE <br />REINHOLD CONSTRUCTION INC. <br />F. QR9ox %66 <br />Address <br />Cocoa. Fl 12g22 <br />ey- <br />AIA DOCU•41NT CM • CHANCE ORDER • APRIL 1970 EDITION • AIAe • Q 1970 ° THE <br />A'MiRICAN INSTITUTE Of ARCHIlECTS. 1735 NEW YORK AVE., NW. WASHINGTON. D.C. <br />INDIAN RIVER COUNTY <br />()! lN9 14th Ave <br />Addresy <br />Veeo ,B. ach . FL 32960 <br />ONE PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.