My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/2/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/2/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:18 AM
Creation date
6/11/2015 1:40:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/02/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OWNER <br />� <br />ARCHITECT <br />S <br />ORDER <br />CONTRACTOR <br />8 <br />FIELD <br />0 - <br />,",A DOCUAfENT 6707 <br />OTHER <br />5 69 <br />PROJECT: Indian River County <br />,name .address) County Administrat!on Bldg. <br />TO (Contractor) <br />Reinhold Construction Inc. <br />P.O,Box 666 <br />Cocoa, FL 32922 <br />CHA!vCE ORDER NUMBER 6,, <br />7 ARCHITECT'S PROJECT NO 9363 <br />CONTRACT FOR Additions and Re"ovations <br />I_ _I CONTRACT DATE.4/2!80 <br />lou are d;rected to male the following changes in this Con!ract <br />7P-113 Provide two short sidewalk connections frprT the new sidewalk to ;569•n3 <br />the License Bureau (N130) and the Welfare area (170), on the <br />north side of the east wing north, at the owners request. <br />the proposed changes in the work may result In additional time <br />required beyond the contract completion date. Addltlonal time <br />will be added to the contract that Is directly related to this change <br />carder. The contractor` will be paid for the additional required days <br />at the rate of$300,00 (three hundred) per day for flixed overhead <br />;osts• The number of days requested are not reflected In the attached <br />Documents_ <br />1f -e original Contract Sum was . . . . . . <br />,.et change by p,e�ious Change Orders . . <br />S <br />340,110.0S <br />+e Contract Sum prior to this Change Order was . <br />3,00603,110.82 <br />ne Contract Sum will be (Increased) K&kXaexll*)dKXutitlX6: WXi by ih!s Change Order <br />$ <br />5 69 <br />0 3 <br />"•e new Contract Sum including this Change Order will be . . . . .S <br />- <br />3, OV,619, <br />F5 <br />I'c Contract Time will be (Increased) (decreased) (unchanged) by <br />.-e Date of Completion as of the date of this Change Order therefore Is <br />,X:ELL METCALF b EDDY R EINHOLD CONSTRUCTION INC. <br />., E C % RACTO ` <br />• •`HIT T -- <br />a�0o, e Highw _��a,Boxi66 <br />Address ---- <br />oral Gab1L�34 _ Cocoa, F1 32922 <br />GY <br />rT[ A O DATE <br />INDIAN RIVER CCUNTY <br />0�1'49 14th Ave <br />Address —� - <br />Vero Beach, FL 32560 <br />DATE ;=L(1�_ <br />+ DOCUMENT 0791 • CHANCE GRDER • APRIL 1970 EDITION • A:ALP T 1910 • THE <br />:R;(Ati I%STITuT[ OF ARCHITECTS, 1775 NEW YORK AVE.. NW. 1VASHINC1C"+, DC. —o00us O*,E P"Cr <br />!' <br />53 <br />Boa 47 RAGE 000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.