My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/30/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/30/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:45:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/30/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 3 01991 BOOK 47 pmc� 629 <br />MOTION WAS MADE BY COMMISSIONER SCURLOCK, SECONDED BY <br />COMMISSIONER BIRD, TO CONTINUE OUR PRESENT INSURANCE PROGRAM ON A <br />MONTH TO MONTH BASIS WHILE STAFF COMPLETES FURTHER INVESTIGATION OF <br />ALTERNATIVE INSURANCE PROGRAMS, HOPEFULLY WITHIN 30 DAYS, <br />COMMISSIONER WODTKE WISHED TO BE SURE THAT WE HAVE A RIDER <br />OR SOME TYPE DOCUMENT FROM MR, ARDEN, OUR PRESENT INSURANCE AGENT, <br />THAT SHOWS THAT WE DO HAVE COVERAGE ON A MONTH TO MONTH BASIS.v <br />THE CHAIRMAN CALLED FOR THE QUESTIONS IT WAS VOTED ON <br />AND CARRIED UNANIMOUSLY <br />_ is <br />COMMISSIONER FLETCHER REQUESTED THAT ITEM B BE WITHDRAWN <br />FROM THE CONSENT AGENDA$ <br />TO The Honorable Members of the DATE: September 14, 1981 FILE: <br />Board of County Commissioners <br />SUBJECT: Request for Partial Bond <br />Laurelwood Unit 4, Laurel <br />FROM: Neil A. Nelson, REFERENCES: Robert T. Shutts , Vice President <br />County Administrator Laurel Builders to Neil Nelson, <br />Dated 9-1-81 <br />DESCRIPTION AND CONDITIONS <br />Laurel Builders is requesting release of 60% of the $65,138.05 cash performance <br />bond posted in August, 1981 for paving and drainage improvement at Laurelwood Unit <br />IV Subdivision. The amount to be released totals $39,082.83. <br />ALTERNATIVES AND ANALYSIS <br />t Inspection of the work on September 14, 1981 by the County Engineer revealed <br />that all curb and gutter work, subgrade work, and base preparation not including-_-,-,-,_, <br />soil -cement application is complete. The completed work is 60% of the total work <br />bonded. <br />RECOMMENDATIONS AND FUNDING <br />It is recommended that the Board approve the release of $39,082.83 (which is <br />60% of the $65,138.05 cash bond) to Laurel Builders, Inc. for that completed paving <br />and drainage work within Laurelwood Unit IV. <br />Funding to be provided from the County's escrow account. <br />
The URL can be used to link to this page
Your browser does not support the video tag.