My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/1981
CBCC
>
Meetings
>
1980's
>
1981
>
10/7/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:48:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/07/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
then install the required pipes to serve the remaining area of the <br />South Beach. Included in that would be a 750,000 gallon ground storage <br />tank and an in-line booster pump station that would be installed at <br />the City Limits, per the agreement. Ile noted that the fire control <br />x,. booster station, that goes in conjunction with the 750,000 gallon <br />ground storage tank, would also be included in the master plan. <br />Commissioner Bird inquired about the scope of work. <br />Mr. Robbins stated that the scope of work that the Board <br />would be authorizing from this point forward would be from the City <br />sub -station site, which is located on the east side of the river near <br />Smuggler's Cove; it would then continue from the south extreme of <br />The Moorings to the South County Line. He explained that this was <br />the other piece that was not included in the present scope of work. <br />Mr. Robbins pointed out that one pipe has not been discussed, and <br />that is the one that would go parallel to the existing 12" from the <br />City Limits to the elevated tower where it connects. He commente:i <br />that all this information has been previously submitted to the Board. <br />Mr. Robbins just wanted - to indicate to the Board that in order *to stay <br />on schedule, there are some permitting activities they need to get <br />under way. He recommended that they indicate a lump sum contract and <br />simply bill for the work that has been done to date; which would be <br />the phase one design. <br />Lengthy discussion ensued regarding expenditure of funds. <br />Mr. Robbins explained that they have not signed any agree- <br />ments with anyone for service, or collected any impact fees, because <br />the agreement has not been signed. He stated that they are at the <br />time where financing should be lined up for the master design. <br />Chairman Lyons commented that it is important that the <br />agreement between the County and the City be signed. <br />� OCT 7 1981 <br />17 <br />goon 47 PAGE U4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.