My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/1981
CBCC
>
Meetings
>
1980's
>
1981
>
10/7/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:48:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/07/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- <br />`����rr� `, <br />O C d pct 715 <br />Intergovernmental Coordinator Thomas elaborated that it <br />was true that the anticipated fees and charges will take care of the <br />first phase, and the people who are going to pay these fees are basing <br />it on the assumption that they are going to have water. <br />Commissioner Fletcher asked if it was possible to create <br />a contingency fund with the users putting up the money to be used <br />for expenses. <br />fees : <br />Mr. Robbins then reviewed the following calculated impact <br />CALCULATION OF PROPOSED <br />IMPACT FEES FOR SOUTH <br />BEACH 1ATER SYSTEM IMPROVEMENTS <br />Prepared by <br />Sverdrup & Parcel and Associates, Inc. <br />Beindorf and Associates, Inc. <br />(A Joint Venture) <br />The following calculation of Impact Fees is based on the proposed 255 <br />water connections paying for the necessary Phase I Improvements for the South <br />Beach Water System. Attached is a copy of the Preliminary Cost Estimate for <br />the Phase I Improvements. <br />Phase I Project Cost <br />Number of Phase I Connections <br />allowed by County -City Agreement <br />Impact Fee Required <br />r <br />$899,515.56 <br />255 Connections <br />$ 3,527.51 <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.