Laserfiche WebLink
-- <br />`����rr� `, <br />O C d pct 715 <br />Intergovernmental Coordinator Thomas elaborated that it <br />was true that the anticipated fees and charges will take care of the <br />first phase, and the people who are going to pay these fees are basing <br />it on the assumption that they are going to have water. <br />Commissioner Fletcher asked if it was possible to create <br />a contingency fund with the users putting up the money to be used <br />for expenses. <br />fees : <br />Mr. Robbins then reviewed the following calculated impact <br />CALCULATION OF PROPOSED <br />IMPACT FEES FOR SOUTH <br />BEACH 1ATER SYSTEM IMPROVEMENTS <br />Prepared by <br />Sverdrup & Parcel and Associates, Inc. <br />Beindorf and Associates, Inc. <br />(A Joint Venture) <br />The following calculation of Impact Fees is based on the proposed 255 <br />water connections paying for the necessary Phase I Improvements for the South <br />Beach Water System. Attached is a copy of the Preliminary Cost Estimate for <br />the Phase I Improvements. <br />Phase I Project Cost <br />Number of Phase I Connections <br />allowed by County -City Agreement <br />Impact Fee Required <br />r <br />$899,515.56 <br />255 Connections <br />$ 3,527.51 <br />s <br />