My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/1981
CBCC
>
Meetings
>
1980's
>
1981
>
10/7/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:48:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/07/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE I <br />SOUTH BEACH WATER SYSTEM IMPROVEMENTS <br />PRELIMINARY 1TE <br />Prepared by <br />Sverdrup & Parcel and Associates, Inc. <br />Beindorf and Associates, Inc. <br />(A Joint Venture) <br />1. Land Acquisition <br />2. In-line Booster Pump Station <br />a. Pump - Horiz. Turbine <br />b. Pump House (10' x 15') <br />c. Misc. Piping, Valves <br />& Fittings <br />3. Ground Storage Tank (GST) <br />(750,000 gal.) <br />4. Pump Station <br />a. Pump - Horiz. Split Case <br />.b. Pump House (25' x 30') <br />c. Misc. Piping, Valves <br />QUANTITY UNIT PRICE COST <br />1 Ac. $175,000.00 $175,000J'' <br />2 Ea. $ 4,800.00 $ <br />150 Sq. Ft. 40.00 6,000.10 <br />1 L.S. 20,000.00 20,000.00 <br />1 L.S. $200,000.00 $200,000.00 <br />2 Ea. $ 81000.00 $ 16,000.00 <br />750 Sq. Ft. 45.00 33,750.00 <br />& Fittings <br />1 <br />L.S. <br />45,000.00 <br />45,000.00 <br />d. Controls <br />1 <br />L.S. <br />45,000.00 <br />45,000.09 <br />5. 14" D.I.P. <br />3,100 L.F. <br />$ 25.00 <br />$ 77,500.0✓ <br />6. Bore & Jack (12" D.I.P.) <br />90 <br />L.F. <br />$ 120.00 <br />$ 10,800.00 <br />Sub -total = <br />$638,650.00 <br />Contingencies (10%) = <br />63,865.00 <br />Sub -total = <br />$702,515.00 <br />Engineering (10.5%) = <br />67,058.00(1) <br />Sub -total = <br />$769,573.00 <br />Legal <br />and <br />Administrative (2.5%) = <br />19,239.00(2) <br />Sub -total = <br />$788,812.00 <br />Purchase of system <br />from City of <br />Vero <br />Beach (per Agreement) = <br />52,703.58 <br />Sub -total = <br />$841,515.58 <br />Purchase of <br />existing meters from City of Vero Beach = <br />58,000.00 <br />TOTAL PROJECT COST = <br />$899,515.58 <br />FOOTNOTES: <br />(1) Engineering fee based on construction cost without contingencies <br />(Engineering includes basic design and construction surveillance). <br />(2) Legal and Administrative based on total project cost including <br />Engineering and contingencies. <br />Engineer's Project No. 7362 September 30, 1981 <br />OCT 7 1981 Bou 4.7 PAGE 716 <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.