Laserfiche WebLink
SOUTH BEACH WATER SYSTEM IMPROVEMENTS <br />The Board next discussed the following memorandum from <br />the County Administrator: <br />TO: The Honorable Members of the <br />Board of County Commissioners <br />FROM:Neil A. Nelson, <br />.-.County Administrator <br />DESCRIPTION AND CONDITIONS <br />DATE: October 28, 1981 FILE: <br />SUBJECT: Engineering Agreement for South Beach <br />Water System Improvements <br />REFERENCES: John A. Robbins, Sverdrup and Parcel <br />to Board of County Commissioners, <br />dated October 28, 1981 <br />Sverdrup and Parcel and Biendorf and Associates, Inc. Joint Venture, has <br />submitted an Engineering Agreement for South Beach Water System Improvements. <br />The agreement instrument, titled Modification Number 6 to Agreement for Engineer- <br />ing Services dated December 20, 1972 is attached for your review. The original <br />Agreement for Engineering Services dated December 20, 1972, was intended to co1-er <br />general water and sewer system engineering on a County wide basis. During the past <br />9 years, 5 Modifications to the 1972 agreement were executed to cover various changes <br />and to specify additional scope of work. These past Modifications were as follows: <br />Modification No. 1 - October 5, 1977 <br />Prepared to provide renovations and extensions to the water supply system <br />and construction of sewage treatment and/or transmission and disposal fa- <br />cilities serving the Gifford area. A leakage study was also involved. <br />Modification No. 2 — October 5, 1977 <br />Prepared for the water pumping station, transmission line, and elevated <br />storage tank north of the City of Vero Beach Water Plant <br />Modification No. 3 - July 13, 1978 <br />Prepared to increase Engineering Service Fees on a rate per hour basis. <br />Modification No. 4 - November 15, 1978 <br />Prepared to provide Engineering for the South County Water System. <br />Modification No. 5 - October 13. 1980 <br />Prepared to compute engineering fees using a multiplier of salary cost rather <br />than a fixed hourly fee rate. <br />Numerous projects since 1972 were performed as additional services under the <br />November 1972 agreement. The 201 facilities plan was covered by a separate agree- <br />ment executed in 1972. <br />N®V 4 1981 BOOK 40 PACE �7 <br />19 <br />