My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1982
CBCC
>
Meetings
>
1980's
>
1982
>
4/7/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:38 AM
Creation date
6/11/2015 2:08:59 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/07/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 7 1982 <br />so <br />49 <br />X287 <br />Motion was made by Commissioner Lyons, <br />seconded <br />by <br />Commissioner Fletcher, that the Board defer this item to the <br />Transportation Planning Committee for their evaluation and <br />recommendation. <br />The Chairman called for the question. It was voted on <br />and carried unanimously. <br />REPAVING PROGRAM - 1981-82 FISCAL YEAR <br />Mr. Davis reviewed the following memorandum dated <br />March 30, 1982 with attachments: <br />DATE: March 30 F1 LE: <br />T0: The Honorable Members of the 1982 <br />Board of County Commissioners <br />Thru: David Greene <br />Acting County Administrator SU BJ ECT: 1982 Road Resurfacing Program <br />Memo: <br />James W. DavisC�k 1) Albert VanAuken to Jim <br />FROM. Public Works Director REFERENCES: Davis, dated 3/9/82 <br />2) Albert <br />and Albert Vamkuken, Superintendent at/ <br />dated <br />to Jim <br />Road and Rridap Divicine Davis, d 3 3/2/82 <br />DESCRIPTION AND CONDITIONS <br />Attached is the proposed resurfacing list for F.Y. 1982. From a survey <br />of the County's existing paved road network, the critical roads requiring re- <br />surfacing are included. In an effort to bring King's Highway to an acceptable <br />twenty-four foot'(241) wide, two-lane major thoroughfare, the widening and re- <br />surfacing from South Gifford Road to the North Relief Canal and between State <br />Road 60 and 12th Street is included. This project was initiated in the late, <br />1970's and is ongoing. In the past, the widening was done using a four inch <br />(41') thick asphalt addition, two feet (21) on each side of existing pavement. <br />It has been found that the County can do this work with limerock at a lesser <br />cost, thus saving $3,817 per one-half (Z) mile. Our savings for 1982 will. <br />amount to approximately $10,700. <br />ALTERKALTIVES AND ANALYSIS <br />As the resurfacing program is to protect the County's investment in it's <br />existing road network, approval is the only alternative recommended. <br />RECO,NIME\'DATIONS AND FUNDING <br />Staff recommends approving the attached 1982 Road Resurfacing Program. <br />Funding to come from Account #004-214-541-35.39, unencumbered balance as of <br />March 30, 1982 is $456,957.94. <br />
The URL can be used to link to this page
Your browser does not support the video tag.