Laserfiche WebLink
APR 141982 <br />*This covers one half <br />cost. The other cost <br />fund activities. <br />Alternative 1 <br />of the cost of the Environmental Services Director personnel <br />to be paid by the Landfill Division and any other enterprize <br />This is the most desired staffing plan. If implemented it would enable the <br />Utilities Department to not only keep up with the growth of the utility systems, but <br />would allow staff opportunity to plan future utility systems in concert with the <br />county's long range land use management plans. - <br />With the plan to organize the Environmental Department consisting of the <br />Utilities and Landfill Divisions, we anticipate that each of these will equally share <br />the expense of the Environmental Department Head from budgeted sources (see organiza- <br />tion diagram). <br />The additional accounting clerk is needed to help keep up with the increased <br />workload and to relieve the secretary of these functions to allow her to perform the <br />ever-increasing workload in the Director's office. The Environmental Technician would <br />use his training to review plans, specifications, set up and perform laboratory tests, <br />perform field inspection of utility systems. This position is mandatory. The additional <br />plant operators would be responsible for operation of the five (5) plants being taken <br />over by the county. An --additional meter reader/maintenance person is needed to assist <br />the current meter reader in reading the new meters and in the day to day maintenance <br />of meters. Two additional maintenance persons are needed to maintain the existing <br />facilities and the facilities being taken over - also, one maintenance man would be <br />trained and devote his time to the maintenance of lift -stations. These additions <br />to the maintenance crew and the increased maintenance required by the additional plant <br />acquisitions require the position change of Field Service Supervisor to Maintenance <br />Superintendent. An additional laborer is needed for clean-up of current and new <br />grounds and buildings. This alternative adds 9.5 personnel with associated equipment <br />(including 4 vehicles and related tools) for an estimated budget increase of $171,316. <br />The only disadvantage of this alternative is the cost - it would tax the current <br />revenue producing capability of the Indian River County Utilities. <br />Alternative 2 <br />This alternative, if implemented, would enable the Utilities Department to keep <br />up with current growth and perform its functions in a more timely manner It would <br />not provide the ultimate coverage but would allow new systems to be brought on line, <br />operated and maintained, as an interim measure while plans are made for next fiscal <br />year's budget. This alternative adds 5.5 personnel with associated equipment (including <br />3 vehicles and related tools and $55,316 -for operations and maintenance costs) for <br />an estimated budget increase of $137,316. <br />Alternative 3 <br />This alternative represents the minimum staff required. It would allow only <br />the basic functions to be performed and would not insure performance of functions <br />in a timely manner. It should be considered only as a stop -gag measure until the <br />new budget goes into effect. Administrative functions would suffer, the possibility <br />of more errors in meter readings and billings would be greater and more tine would <br />be required for corrective maintenance than for preventive maintenance. This alterna- <br />tive will require 2 vehicles and related special tools and equipment and 555,316 for <br />operations and maintenance costs and will require an estimated budget increase of <br />$114,316 <br />Recommendation and Funding <br />It is recommended that Alternative II be approved. Even though Alternative I <br />provides the best solution to the problem, Alternative II will allow for more time <br />to re-cruit, hire and train the needed personnel. The balance of staff requirements <br />can be included in the new budget for fiscal year 82-83. I cannot overemphasize <br />the immediate need for these positions, vehicles and related special tools and <br />equipment. The added revenue (estimated to be $173,000) produced from the systems <br />A=na aquired will more than o -i yet the cost. <br />