My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/19/1982
CBCC
>
Meetings
>
1980's
>
1982
>
5/19/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:38 AM
Creation date
6/11/2015 2:26:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/19/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 191982 <br />The funding for the construction and engineering of the Phase F water <br />improvements will be accomplished by the utilization of funds from the <br />project contingency of the South County dater System. The construct- <br />ion can therefore be accomplished by a Contract Change Order to Scar- <br />borough Constructors, Inc.'s original contract, taking advantage of <br />the original low unit prices for pipe. •. <br />Phase II of the Water Improvements will utilize the remaining <br />$2,017,100 water monies. A program for the implementation of these <br />monies will be presented to the Board, once the consulting engineers <br />have completed their evaluation of the best possible use of these <br />funds. <br />3. Wastewater Improvements <br />It is the recommendation of County Staff to authorize the Consulting <br />Engineers to begin the design of the wastewater improvements to the <br />existing Treasuee Coast and Ixora Wastewater Utilities in order to <br />meet the completion date established in the Consent Order. <br />Funding for the wastewater improvements will be made from the $733,600 <br />FmHA loan monies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.