My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1982
CBCC
>
Meetings
>
1980's
>
1982
>
6/16/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:03:24 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/16/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and <br />RESOLUTION NO. 75-37 <br />WHEREAS, Indian River County has suffered beach erosion; <br />WHEREAS,a public hearing was held to attempt to find a <br />solution to the problem; and <br />WHEREAS, the City of Vero Beach, the Sebastian.Inlet <br />District and Indian River County have agreed to certain recom- <br />mendations; <br />NOW, THEREFORE, BE IT RESOLVED by the Board of County <br />Commissioners of Indian River County, Florida that it supports <br />the State of Florida's and Army Corps of Enginecrs' recommendations <br />for the Sebastian State Park area as follows: <br />1. The Federal project should provide t'or a protectiv(_ <br />and recreational beach and .future maintei)ance nourishment. It <br />wou.1,.i be very desirable for the project to provide for development <br />of a more efficient sand tran:;fer system at the Inlet and partic- <br />ipation in the operation of that system. We would prefer to have <br />the breakwater groin South of the Inlet included as an authorized <br />alternative for construction only after its need is clearly demon- <br />strated. A monitoring program should definitely be included as a <br />part of a project in this area. The monitoring program would <br />assist in the evaluation of the project and is particularly import- <br />ant for assessing the effectiveness of the sand transfer operation <br />at the Inlet as well as for determining the need for the deferred <br />structure. <br />WITHIN CITY OF VERO BEACH <br />Z. Recommend and concur with the Corps of Engineers' <br />/ recommendation for beachfill renourishment in the project area, <br />including a breakwater groin as an authorized alternative for <br />construction only after its need is clearly demonstrated. A <br />monitoring program would assist in the evaluation of the project <br />and is particularly important for assessing the results of the <br />beach -fill project. <br />3. Recommend a test reef known as the Sabecon Reef be <br />an authorized alternative for construction, undertaken by the <br />Corps of Engineers as authorized by.the United States -Congress. <br />This <br />test reef to consist of <br />two tangents of the reef with no <br />JUN 16 <br />1982 <br />DUCK ;e: 50 PAR <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.